Time-Dependent Foundation Settlement of Super High-Rise Buildings in Soft Clay Area
|
Bibliografische Angaben
Autor(en): |
Shehong Liu
Juyun Yuan Xin Zhao |
||||
---|---|---|---|---|---|
Medium: | Tagungsbeitrag | ||||
Sprache(n): | Englisch | ||||
Tagung: | IABSE Symposium: Engineering for Progress, Nature and People, Madrid, Spain, 3-5 September 2014 | ||||
Veröffentlicht in: | IABSE Symposium Madrid 2014 | ||||
|
|||||
Seite(n): | 491-498 | ||||
Anzahl der Seiten (im PDF): | 8 | ||||
Jahr: | 2014 | ||||
DOI: | 10.2749/222137814814028016 | ||||
Abstrakt: |
The settlement of foundation includes initial settlement, consolidation settlement and secondary consolidation settlement. By considering the mechanism of foundation settlement and the upper structural properties of time-dependent materials, time-dependent loads and time-dependent structures, the time-dependent rules of foundation settlement in soft clay are investigated in this study. Existing settlement prediction models are further developed, and a stepped loading time- dependent settlement model for the super high-rise buildings in soft clay is proposed. Numerical simulation of a super high-rise building project illustrates the effectiveness of the proposed time- dependent settlement model. The time-dependent settlement model developed in this study provides a foundation for further studies on the time-dependent effects due to the upper structure-foundation- subgrade interaction. |
||||
Stichwörter: |
Fundament Interaktion
|