Technical rehabilitation and strengthening of the Chemnitz viaduct
|
Bibliografische Angaben
Autor(en): |
Richard Stroetmann
(KREBS+KIEFER Ingenieure GmbH, Dresden, Germany)
Steffen Oertel (KREBS+KIEFER Ingenieure GmbH, Dresden, Germany) Alexander Fuchs (KREBS+KIEFER Ingenieure GmbH, Dresden, Germany) |
||||
---|---|---|---|---|---|
Medium: | Tagungsbeitrag | ||||
Sprache(n): | Englisch | ||||
Tagung: | IABSE Congress: Beyond Structural Engineering in a Changing World, San José, Cost Rica, 25-27 Seotember 2024 | ||||
Veröffentlicht in: | IABSE Congress San José 2024 | ||||
|
|||||
Seite(n): | 587-594 | ||||
Anzahl der Seiten (im PDF): | 8 | ||||
DOI: | 10.2749/sanjose.2024.0587 | ||||
Abstrakt: |
The Chemnitz viaduct, which was built between 1901 and 1909 for a four-track operation, was tech- nically refurbished and reinforced for modern use in accordance with the requirements of the his- torical monument preservation. The two inner tracks will be used for future railway traffic, while the outer bridge structures will accommodate inspection, maintenance and emergency routes as well as technical equipment. The approx. 275 m long and 17.50 m wide bridge consists of 2 arch and 10 girder segments. During the technical repair, the inner girder segments were renewed as a steel- concrete composite structure. The other structures were repaired, strengthened and supplemented with a reinforced concrete structure above the curved steel sheet. This article begins with an over- view of the existing bridge structure and its future use. This is followed by explanations of the plan- ning and execution of the construction work. |
||||
Stichwörter: |
Brückenlager Nietverbindung Instandsetzung
|