0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

Technical plan for the realization of five footbridges in the ring road of Catania

Autor(en):





Medium: Tagungsbeitrag
Sprache(n): Englisch
Tagung: Footbridge 2005 (Second International Congress), Venezia, 06-08 December 2005
Veröffentlicht in:
Jahr: 2005
Abstrakt:

In this article we want to analyse the design of five footbridges in functional adjustment of the ring road of Catania, in Sicily. In case of earthquake are necessary planned interventions: for this reason some flyover will be demolished to restore the road system with the creation of ring junctions.

However, when the project will be ended, the city will be divided in two areas for the lack of pedestrian links between the south and the north of the road system.

The goal of our study is to create a link between this two areas of the city, that will be separated with the creation of the new ring road.

Geografische Orte

Structurae kann Ihnen derzeit diese Veröffentlichung nicht im Volltext zur Verfügung stellen.
  • Über diese
    Datenseite
  • Reference-ID
    10075099
  • Veröffentlicht am:
    03.03.2017
  • Geändert am:
    02.06.2021
 
Structurae kooperiert mit
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine