0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

Sustainable Design and Construction of Bridge – Case Study of Design of Arch Bridge in Nepal using Multi-Criteria Decision Analysis

 Sustainable Design and Construction of Bridge – Case Study of Design of Arch Bridge in Nepal using Multi-Criteria Decision Analysis
Autor(en): , ,
Beitrag für IABSE Congress: Engineering for Sustainable Development, New Delhi, India, 20-22 September 2023, veröffentlicht in , S. 681-689
DOI: 10.2749/newdelhi.2023.0681
Preis: € 25,00 inkl. MwSt. als PDF-Dokument  
ZUM EINKAUFSWAGEN HINZUFÜGEN
Vorschau herunterladen (PDF-Datei) 1.13 MB

The importance of sustainability in transport infrastructure continues to gain momentum. Policymakers and planners play a vital role in integrating sustainability into transport infrastructure, so ...
Weiterlesen

Bibliografische Angaben

Autor(en): (ANK Construction Co. Pvt. Ltd)
(A&A Infrastructure Engineering Pvt. Ltd)
(A&A Infrastructure Engineering Pvt. Ltd)
Medium: Tagungsbeitrag
Sprache(n): Englisch
Tagung: IABSE Congress: Engineering for Sustainable Development, New Delhi, India, 20-22 September 2023
Veröffentlicht in:
Seite(n): 681-689 Anzahl der Seiten (im PDF): 9
Seite(n): 681-689
Anzahl der Seiten (im PDF): 9
DOI: 10.2749/newdelhi.2023.0681
Abstrakt:

The importance of sustainability in transport infrastructure continues to gain momentum. Policymakers and planners play a vital role in integrating sustainability into transport infrastructure, so sustainability assessment should begin with decision-making. This paper highlights the use of the Multi-criteria Decision Analysis (MCDA) technique: Analytical Hierarchy Process (AHP) to compare bridge design options in terms of sustainability. AHP can be a user-friendly assessment tool in developing countries where incorporating sustainability is not prioritized yet. The project "Design and Build of Bridges along Narayanghat-Mugling Highway" in Nepal is selected as the case study. Using AHP, a monolithic concrete arch bridge was compared with a two simply supported spans of prestressed concrete bridge. Criteria such as economic, environment, construction ease and maintenance were incorporated in the AHP. The results of AHP show that the Arch bridge is a more sustainable design option.

Stichwörter:
Bogenbrücke Nachhaltiges Entwerfen