0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

Structural Performance of Hybrid Timber Girder Highway Bridge

Autor(en):
Medium: Tagungsbeitrag
Sprache(n): Englisch
Tagung: 35th Annual Symposium of IABSE / 52nd Annual Symposium of IASS / 6th International Conference on Space Structures: Taller, Longer, Lighter - Meeting growing demand with limited resources, London, United Kingdom, September 2011
Veröffentlicht in:
Jahr: 2011
Abstrakt:

The timber highway bridge (Maruyamasawa Bridge) objected in this study is a new hybrid type structure which is prestressed by four steel wires inserted into glulam (glue laminated timber) main girder. The main design geometry is as, span length: 19m, clear width: 7m. By this hybrid structure, long span and light weight of a main girder, and simplify of joint part by high tension bolts are expected. The bridge is constructed as the first to the hybrid timber girder bridge in Japan in 2003. For investigation of structural characteristics, the static and dynamic field tests were done with two dump trucks in 2004. Furthermore, three dimensional static and eigenvalue analyses of the bridge were done using MSC/NASTRAN. This study investigates the structural performance on static and dynamic characteristics base on the field tests and the analyses, and gives a valuable data to evaluate structural performance for modern timber hybrid highway bridges.

Stichwörter:
Feldversuche
Structurae kann Ihnen derzeit diese Veröffentlichung nicht im Volltext zur Verfügung stellen.
  • Über diese
    Datenseite
  • Reference-ID
    10065542
  • Veröffentlicht am:
    03.10.2011
  • Geändert am:
    05.07.2021
 
Structurae kooperiert mit
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine