0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

Structural Health Monitoring of Crusell Bridge

 Structural Health Monitoring of Crusell Bridge
Autor(en): , , ,
Beitrag für IABSE Congress: Challenges in Design and Construction of an Innovative and Sustainable Built Environment, Stockholm, Sweden, 21-23 September 2016, veröffentlicht in , S. 1797-1802
DOI: 10.2749/stockholm.2016.1802
Preis: € 25,00 inkl. MwSt. als PDF-Dokument  
ZUM EINKAUFSWAGEN HINZUFÜGEN
Vorschau herunterladen (PDF-Datei) 0.18 MB

Crusell Bridge is a cable stayed bridge recently built in the city center of Helsinki. In the very beginning of the project the Client City of Helsinki decided to utilize the newest technology in a...
Weiterlesen

Bibliografische Angaben

Autor(en): (M.Sc., Civ. Eng. WSP Finland Ltd Oulu, Finland)
(Savcor Oy Mikkeli, Finland)
(M.Sc. Econ. Savcor Oy Mikkeli, Finland)
(M.Sc., Civ. Eng. WSP Finland Ltd Oulu, Finland)
Medium: Tagungsbeitrag
Sprache(n): Englisch
Tagung: IABSE Congress: Challenges in Design and Construction of an Innovative and Sustainable Built Environment, Stockholm, Sweden, 21-23 September 2016
Veröffentlicht in:
Seite(n): 1797-1802 Anzahl der Seiten (im PDF): 6
Seite(n): 1797-1802
Anzahl der Seiten (im PDF): 6
Jahr: 2016
DOI: 10.2749/stockholm.2016.1802
Abstrakt:

Crusell Bridge is a cable stayed bridge recently built in the city center of Helsinki. In the very beginning of the project the Client City of Helsinki decided to utilize the newest technology in all phases. The project was a pilot project in using Building Information Modeling (BIM) technology in design and construction and finally in monitoring as part of maintenance. In order to develop modern maintenance scheme, an intelligent monitoring system was designed and installed in the bridge. The monitoring system has been tested by a loading test and comprehensive test results have been compared with theoretical calculation analysis. The results verified the design and gave designers guidelines to specify alarming limits to monitoring system. The owner of the bridge will get a summary report from the maintenance system once per year.

Bauwerke und Projekte