0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

Seismic Assessment and Retrofit of the Caronte Viaduct (A55 Highway, Martigues)

 Seismic Assessment and Retrofit of the Caronte Viaduct (A55 Highway, Martigues)
Autor(en):
Beitrag für IABSE Symposium: Tomorrow’s Megastructures, Nantes, France, 19-21 September 2018, veröffentlicht in , S. S23-1
DOI: 10.2749/nantes.2018.s23-1
Preis: € 25,00 inkl. MwSt. als PDF-Dokument  
ZUM EINKAUFSWAGEN HINZUFÜGEN
Vorschau herunterladen (PDF-Datei) 0.12 MB

Because of advanced disorders, the Caronte emblematic viaduct of Martigues in the South of France (A55 Highway) was submitted to a repair and strengthening operation, which also included seismic as...
Weiterlesen

Bibliografische Angaben

Autor(en): (Cerema - Territorial Division for the Mediterranean Regions, Aix-en-Provence, France)
Medium: Tagungsbeitrag
Sprache(n): Englisch
Tagung: IABSE Symposium: Tomorrow’s Megastructures, Nantes, France, 19-21 September 2018
Veröffentlicht in:
Seite(n): S23-1 Anzahl der Seiten (im PDF): 6
Seite(n): S23-1
Anzahl der Seiten (im PDF): 6
DOI: 10.2749/nantes.2018.s23-1
Abstrakt:

Because of advanced disorders, the Caronte emblematic viaduct of Martigues in the South of France (A55 Highway) was submitted to a repair and strengthening operation, which also included seismic assessment and retrofit. After having compared different possible seismic retrofitting strategies, the performed studies led to a solution consisting in replacing and softening the bearing system of the bridge, adding lateral shear keys at each abutment and pier and installing high capacity prestressed seismic dampers in the longitudinal direction at each abutment. Specific geotechnical tests were also carried out that enabled to avert soil liquefaction hazard on this very sensitive site. The proposed solution leads to justify a level of performance close to 70% of what is required for new bridges according to current French seismic rules, for an estimated cost of about 15% of the global repair cost and a repair to rebuild ratio barely higher than 1%.

Stichwörter:
Viadukt Zeitschrittanalyse

Bauwerke und Projekte