São Vicente Suspension Bridge Rehabilitation and Cable Substituion
|
Bibliografische Angaben
Autor(en): |
Rafael Timerman
(ENGETI Consultoria e Engenharia, São Paulo, Brazil)
Francisco Prieto Aguilera (FHECOR Ingenieros Consultores, Madrid, Spain) |
||||
---|---|---|---|---|---|
Medium: | Tagungsbeitrag | ||||
Sprache(n): | Englisch | ||||
Tagung: | IABSE Symposium: Towards a Resilient Built Environment Risk and Asset Management, Guimarães, Portugal, 27-29 March 2019 | ||||
Veröffentlicht in: | IABSE Symposium Guimarães 2019 | ||||
|
|||||
Seite(n): | 1458-1464 | ||||
Anzahl der Seiten (im PDF): | 7 | ||||
DOI: | 10.2749/guimaraes.2019.1458 | ||||
Abstrakt: |
The São Vicente Suspension Bridge was built in 1914 as part of the plan for the sanitation of the São Vicente city. The bridge is listed by Brazilian historical heritage since 1982. In 2012, the conditions of the main structural elements were critical and needed recovery or substitution. The structural design considered the complete recovery of the steel main deck connected by rivets, the calculation of the new suspension system that would replace the existing one using temporary cables, towers and anchorage blocks. The bridge was reopened to the public in October of 2015. |
||||
Stichwörter: |
Tragwerksentwurf Hängebrücke Instandsetzung
|