Safety Risk Analysis of Super-Large Span Suspension Bridge Supporting Rotary Structure Composite Ground Wall Anchorage Foundation
|
Bibliografische Angaben
Autor(en): |
Zhang Qingyun
(Jiangsu Provincial Transportation Engineering Construction Bureau,Jiangsu,China)
Li Hongtao (Jiangsu Provincial Transportation Engineering Construction Bureau,Jiangsu,China) Ruan Jing (Jiangsu Provincial Transportation Engineering Construction Bureau,Jiangsu,China) Wang Rengui (CCCC HIGHWAY CONSULTANTS CO.,LTD., Xicheng City, BeiJing, China) Wei Leyong (CCCC HIGHWAY CONSULTANTS CO.,LTD., Xicheng City, BeiJing, China) Liang Zhenyou (CCCC HIGHWAY CONSULTANTS CO.,LTD., Xicheng City, BeiJing, China) Feng Qinghai (CCCC HIGHWAY CONSULTANTS CO.,LTD., Xicheng City, BeiJing, China) Han Dongdong (CCCC Highway Bridges National Engineering Research Centre CO., Ltd., Xicheng City, BeiJing, China) Du Longji (CCCC Highway Bridges National Engineering Research Centre CO., Ltd., Xicheng City, BeiJing, China) |
||||
---|---|---|---|---|---|
Medium: | Tagungsbeitrag | ||||
Sprache(n): | Englisch | ||||
Tagung: | IABSE Congress: Bridges and Structures: Connection, Integration and Harmonisation, Nanjing, People's Republic of China, 21-23 September 2022 | ||||
Veröffentlicht in: | IABSE Congress Nanjing 2022 | ||||
|
|||||
Seite(n): | 1353-1361 | ||||
Anzahl der Seiten (im PDF): | 9 | ||||
DOI: | 10.2749/nanjing.2022.1353 | ||||
Abstrakt: |
According to the geological characteristics of the deep soft overburden and high pressurized water where the anchor of the 2300 meters suspension bridge is located, the safety risk analysis of the diaphragm wall anchorage foundation with rectangular-ambulatory-plane was carried out, and the risk sources were sorted out. The risk levels of each risk source were evaluated by expert questionnaire, and the risk levels of anchorage were analyzed by Kent index method. The countermeasures of all risk sources were formulated, and the main risk factors were studied. On this basis, the design scheme of anchorage foundation was optimized, the key control measures of risk factors in the construction process were put forward, and the corresponding emergency plans for main construction risks were formulated, which provided a guarantee for the smooth implementation of anchorage foundation scheme. |
||||
Stichwörter: |
Hängebrücke Risikobewertung Ankerblock Schlitzwand
|
||||
Copyright: | © 2022 International Association for Bridge and Structural Engineering (IABSE) | ||||
Lizenz: | Die Urheberrechte (Copyright) für dieses Werk sind rechtlich geschützt. Es darf nicht ohne die Zustimmung des Autors/der Autorin oder Rechteinhabers/-in weiter benutzt werden. |