0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

Risk assessment under temporary use conditions

 Risk assessment under temporary use conditions
Autor(en): ORCID,
Beitrag für IABSE Congress: Challenges in Design and Construction of an Innovative and Sustainable Built Environment, Stockholm, Sweden, 21-23 September 2016, veröffentlicht in , S. 912-920
DOI: 10.2749/stockholm.2016.0899
Preis: € 25,00 inkl. MwSt. als PDF-Dokument  
ZUM EINKAUFSWAGEN HINZUFÜGEN
Vorschau herunterladen (PDF-Datei) 0.19 MB

The present paper addresses the challenging issue of establishing acceptable risks or target reliability levels, taking account of temporary use conditions of structures. Acceptance criteria for bu...
Weiterlesen

Bibliografische Angaben

Autor(en): ORCID (Instituto de Ciencias de la Construcción Eduardo Torroja (IETcc-CSIC), Madrid, Spain)
(Instituto de Ciencias de la Construcción Eduardo Torroja (IETcc-CSIC), Madrid, Spain)
Medium: Tagungsbeitrag
Sprache(n): Englisch
Tagung: IABSE Congress: Challenges in Design and Construction of an Innovative and Sustainable Built Environment, Stockholm, Sweden, 21-23 September 2016
Veröffentlicht in:
Seite(n): 912-920 Anzahl der Seiten (im PDF): 9
Seite(n): 912-920
Anzahl der Seiten (im PDF): 9
Jahr: 2016
DOI: 10.2749/stockholm.2016.0899
Abstrakt:

The present paper addresses the challenging issue of establishing acceptable risks or target reliability levels, taking account of temporary use conditions of structures. Acceptance criteria for building structure related-risks to persons obtained in prior studies are adapted to the special circumstances of non-permanent exposure of the building users. Thereby, the general principle followed is to maintain the same risk levels per time unit as for permanently occupied buildings. The adaption is based on the statistical annual fatality rate, a recently proposed life safety risk metric which allows for consistent comparison of risks across different societal activities and technologies. It is shown that the target reliability indexes taking account of the temporary use of buildings might be significantly higher than the values suggested for permanently used structures.

Stichwörter:
Zuverlässigkeit Einsturz Wahrscheinlichkeit