0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

Risk assessment of a long span unsymmetrical extroversion arch bridge

 Risk assessment of a long span unsymmetrical extroversion arch bridge
Autor(en): ,
Beitrag für IABSE Symposium: Improving Infrastructure Worldwide, Weimar, Germany, 19-21 September 2007, veröffentlicht in , S. 294-295
DOI: 10.2749/222137807796157995
Preis: € 25,00 inkl. MwSt. als PDF-Dokument  
ZUM EINKAUFSWAGEN HINZUFÜGEN
Vorschau herunterladen (PDF-Datei) 0.17 MB

Nanning Bridge is the first long span unsymmetrical extroversion arch bridge with a curve steel gird in the world. The main span of the bridge is 300m, and the incline angles of two main arch ribs ...
Weiterlesen

Bibliografische Angaben

Autor(en):

Medium: Tagungsbeitrag
Sprache(n): Englisch
Tagung: IABSE Symposium: Improving Infrastructure Worldwide, Weimar, Germany, 19-21 September 2007
Veröffentlicht in:
Seite(n): 294-295 Anzahl der Seiten (im PDF): 8
Seite(n): 294-295
Anzahl der Seiten (im PDF): 8
Jahr: 2007
DOI: 10.2749/222137807796157995
Abstrakt:

Nanning Bridge is the first long span unsymmetrical extroversion arch bridge with a curve steel gird in the world. The main span of the bridge is 300m, and the incline angles of two main arch ribs are 69.7°and 66.5°. Construction technology, nature hazards and some accidents which may happen during the construction process have to be considered. A two stages risk assessment method is proposed. At the first stage, an expert investigation which is based on analytical hierarchy process (AHP) is carried out, cable supported construction scheme and hybrid supported construction scheme are compared, and cable supported schemes is recommended due to its low risks. At the second stage, 21 main risk events which may occur in the cable supported construction scheme are assessed in detail, based on a qualitative and quantitative combined assessment method, and appropriate countermeasures for those risk factors are also recommended. The risk assessment method proposed in the paper can be applied in similar bridges.

Stichwörter:
Bauprozeß Risikobewertung