Risk Acceptance Criteria for Extreme fjord Crossings

 Risk Acceptance Criteria for Extreme fjord Crossings
Autor(en): ,
Beitrag für IABSE Symposium: Towards a Resilient Built Environment Risk and Asset Management, Guimarães, Portugal, 27-29 March 2019, veröffentlicht in , S. 1402-1409
DOI: 10.2749/guimaraes.2019.1402
Preis: € 25,00 inkl. MwSt. als PDF-Dokument  
ZUM EINKAUFSWAGEN HINZUFÜGEN
Vorschau herunterladen (PDF-Datei) 0.7 MB

The objective of this paper is to identify challenges related to conventional design criteria in structural engineering and outline a risk-based approach for design of fjord crossings in the Coasta...
Weiterlesen

Bibliografische Angaben

Autor(en): (Norwegian Public Roads Administration, Oslo, Norway)
(Norwegian Public Roads Administration, Oslo, Norway)
Medium: Tagungsbeitrag
Sprache(n): Englisch
Tagung: IABSE Symposium: Towards a Resilient Built Environment Risk and Asset Management, Guimarães, Portugal, 27-29 March 2019
Veröffentlicht in:
Seite(n): 1402-1409 Anzahl der Seiten (im PDF): 8
Seite(n): 1402-1409
Anzahl der Seiten (im PDF): 8
DOI: 10.2749/guimaraes.2019.1402
Abstrakt:

The objective of this paper is to identify challenges related to conventional design criteria in structural engineering and outline a risk-based approach for design of fjord crossings in the Coastal highway route E39 project. A key message is that conventional design criteria have limitations when used as a basis for making decisions about risk, and must therefore be complemented by risk acceptance criteria that reflect both the frequency and consequences of hazardous events. The paper proposes a risk acceptance criterion by way of an FN-curve, and outlines a practical approach for combining this with design criteria in the design of fjord crossings. The process is iterative and requires that designers are willing to go back and consider the need for risk reducing measures, calling for awareness of uncertainties and willingness to implement ALARP as a guiding principle even in face of resource constraints.