A Review of North American Railway Bridge Research
|
Bibliografische Angaben
Autor(en): |
Robert A. P. Sweeney
Duane Otter |
||||
---|---|---|---|---|---|
Medium: | Tagungsbeitrag | ||||
Sprache(n): | Englisch | ||||
Tagung: | IABSE Symposium: Improving Infrastructure Worldwide, Weimar, Germany, 19-21 September 2007 | ||||
Veröffentlicht in: | IABSE Symposium Weimar 2007 | ||||
|
|||||
Seite(n): | 184-187 | ||||
Anzahl der Seiten (im PDF): | 8 | ||||
Jahr: | 2007 | ||||
DOI: | 10.2749/222137807796120193 | ||||
Abstrakt: |
The paper gives a brief overview of current research work undertaken at the North American Facility for Accelerated Service Testing (FAST) railway test facility and on several railroads that are members of the Association of American Railroads (AAR). |
||||
Stichwörter: |
Ermüdung Eisenbahnbrücke Stahlbrücke Betonbrücke
|