Research on location control of GPS in Super high-rise building construction
|
Bibliografische Angaben
Autor(en): |
Yunkai Guo
Dongli Peng Shengguang Dong |
||||
---|---|---|---|---|---|
Medium: | Tagungsbeitrag | ||||
Sprache(n): | Englisch | ||||
Tagung: | 17th IABSE Congress: Creating and Renewing Urban Structures – Tall Buildings, Bridges and Infrastructure, Chicago, USA, 17-19 September 2008 | ||||
Veröffentlicht in: | IABSE Congress Chicago 2008 | ||||
|
|||||
Seite(n): | 598-599 | ||||
Anzahl der Seiten (im PDF): | 9 | ||||
Jahr: | 2008 | ||||
DOI: | 10.2749/222137908796294225 | ||||
Abstrakt: |
The transforming of survey datum and the control of axis, vertical level, and elevation are of great importance on controlling quality of high-rise building construction. In order to maintain project quality and construction efficiency, to improve the efficiency of survey position and observing precision, also to explore the more scientific and faster method in survey position of constructions, this dissertation systematically elaborates the base principles in using GPS technology on high-rise building construction, putting forth the base method in the design of technology, operation, data processing, and error analysis etc, when GPS technology is used in high rise building construction. And then it is proved by using this technology in the project of Construction Bank building of Xiamen. |