Research on Key Technology of Large Tonnage Steel Beam Fast Sliding Positioning

 Research on Key Technology of Large Tonnage Steel Beam Fast Sliding Positioning
Autor(en): , ,
Beitrag für IABSE Congress: Bridges and Structures: Connection, Integration and Harmonisation, Nanjing, People's Republic of China, 21-23 September 2022, veröffentlicht in , S. 1015-1022
DOI: 10.2749/nanjing.2022.1015
Preis: € 25,00 inkl. MwSt. als PDF-Dokument  
ZUM EINKAUFSWAGEN HINZUFÜGEN
Vorschau herunterladen (PDF-Datei) 0.24 MB

A certain bridge adopts the green design of "one span across the river", and the installation of 21 pieces of steel box girder on the south span is limited by geographical conditions, tower limb wi...
Weiterlesen

Bibliografische Angaben

Autor(en): (CCCC Shec Fourth Engineering Co., Ltd)
(Shanghai Tongji Detection Technology Co)
(Shaoxing College of Arts and Sciences)
Medium: Tagungsbeitrag
Sprache(n): Englisch
Tagung: IABSE Congress: Bridges and Structures: Connection, Integration and Harmonisation, Nanjing, People's Republic of China, 21-23 September 2022
Veröffentlicht in:
Seite(n): 1015-1022 Anzahl der Seiten (im PDF): 8
Seite(n): 1015-1022
Anzahl der Seiten (im PDF): 8
DOI: 10.2749/nanjing.2022.1015
Abstrakt:

A certain bridge adopts the green design of "one span across the river", and the installation of 21 pieces of steel box girder on the south span is limited by geographical conditions, tower limb width and construction period. Innovatively developed a dedicated skid scooter, the steel box girder successfully crosses the orbit change position with the help of the windlass,move laterally to the tower area,replace the longitudinal skid scooter,move to the design bridge. In the steel beam positioning link, firstly, set bearing pre-offsetting on pier top support to circumvent the influence of steel box girder welding, shrinkage creep deformation and closure temperature difference on the displacement of beam length. After the bridge is completed, the feasibility and reliability of the research method are verified by elevation measurement, static load test and implementation process.