0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

Replacing a tower at Cape Verdes – Challenges from hard environmental conditions and a modular concept

 Replacing a tower at Cape Verdes – Challenges from hard environmental conditions and a modular concept
Autor(en): ,
Beitrag für IABSE Conference: Assessment, Upgrading and Refurbishment of Infrastructures, Rotterdam, The Netherlands, 6-8 May 2013, veröffentlicht in , S. 628-629
DOI: 10.2749/222137813806548587
Preis: € 25,00 inkl. MwSt. als PDF-Dokument  
ZUM EINKAUFSWAGEN HINZUFÜGEN
Vorschau herunterladen (PDF-Datei) 0.98 MB

The hitherto existing accessible tower used for atmospheric measurements in Sao Vicente / Cape Verdes consisted of a galvanized steel structure heavily deteriorated by corrosion already in a very s...
Weiterlesen

Bibliografische Angaben

Autor(en):

Medium: Tagungsbeitrag
Sprache(n): Englisch
Tagung: IABSE Conference: Assessment, Upgrading and Refurbishment of Infrastructures, Rotterdam, The Netherlands, 6-8 May 2013
Veröffentlicht in:
Seite(n): 628-629 Anzahl der Seiten (im PDF): 7
Seite(n): 628-629
Anzahl der Seiten (im PDF): 7
Jahr: 2013
DOI: 10.2749/222137813806548587
Abstrakt:

The hitherto existing accessible tower used for atmospheric measurements in Sao Vicente / Cape Verdes consisted of a galvanized steel structure heavily deteriorated by corrosion already in a very short time. The high level of corrosion was caused by the fairly hard environmental conditions prevailing at the coast of the island due to the unprotected exposure to strong winds in combination with the spray of seawater. Consequently, the design of the needed replacement structure was reconsidered resulting in a structure built from hardwood connected with stainless steel components. The paper presents the major challenges of designing a sustainable structure in order to resist extremely hard exposition to seawater, high temperatures and heavy wind loading. Additionally, the structure has to be designed for a modular assembling scheme in order to meet the requirements arising from the shipment in containers.

Stichwörter:
Korrosion Turm Schrägseile Mast