0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

Replacement of the Macdonald Bridge Suspended Spans: Fabrication and Field Construction Works

 Replacement of the Macdonald Bridge Suspended Spans: Fabrication and Field Construction Works
Autor(en): ,
Beitrag für IABSE Symposium: Engineering the Future, Vancouver, Canada, 21-23 September 2017, veröffentlicht in , S. 951-958
DOI: 10.2749/vancouver.2017.0951
Preis: € 25,00 inkl. MwSt. als PDF-Dokument  
ZUM EINKAUFSWAGEN HINZUFÜGEN
Vorschau herunterladen (PDF-Datei) 0.2 MB

The Angus L. Macdonald Bridge, completed in 1955, connects Dartmouth and downtown Halifax, Nova Scotia, Canada. This suspension bridge is 762 m long, with a 441 m long main span. The deck of the su...
Weiterlesen

Bibliografische Angaben

Autor(en): (COWI Bridge North America, North Vancouver, BC, Canada)
(COWI Bridge North America, North Vancouver, BC, Canada)
Medium: Tagungsbeitrag
Sprache(n): Englisch
Tagung: IABSE Symposium: Engineering the Future, Vancouver, Canada, 21-23 September 2017
Veröffentlicht in:
Seite(n): 951-958 Anzahl der Seiten (im PDF): 8
Seite(n): 951-958
Anzahl der Seiten (im PDF): 8
Jahr: 2017
DOI: 10.2749/vancouver.2017.0951
Abstrakt:

The Angus L. Macdonald Bridge, completed in 1955, connects Dartmouth and downtown Halifax, Nova Scotia, Canada. This suspension bridge is 762 m long, with a 441 m long main span. The deck of the suspended spans reached the end of its functional life and the entire superstructure was replaced segment-by-segment during full weekend and evening closures of the bridge, with traffic using the bridge during weekdays. The new deck segments were fully prefabricated, including an initial thin layer of wearing surface, and erected in a way that allowed traffic to use the bridge immediately following the replacement of an existing deck segment. This paper describes some aspects of the complex fabrication of the bridge superstructure. It further describes how the deck segments were replaced and explains unique challenges encountered during segment replacement and how they were addressed.‌‌

Stichwörter:
Stahl Errichtung Fertigung Hängebrücke Überbauaustausch

Bauwerke und Projekte