0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

Replacement of Corroded Cable Stays on Tjörn Bridge

 Replacement of Corroded Cable Stays on Tjörn Bridge
Autor(en): , , ,
Beitrag für IABSE Congress: Challenges in Design and Construction of an Innovative and Sustainable Built Environment, Stockholm, Sweden, 21-23 September 2016, veröffentlicht in , S. 1748-1755
DOI: 10.2749/stockholm.2016.1753
Preis: € 25,00 inkl. MwSt. als PDF-Dokument  
ZUM EINKAUFSWAGEN HINZUFÜGEN
Vorschau herunterladen (PDF-Datei) 0.19 MB

This paper presents the replacement of cable stays of the 33 years old Tjörn Bridge located in Sweden. The bridge has a main span 366 m and a total length of 664 m. The bridge has a locked coil cab...
Weiterlesen

Bibliografische Angaben

Autor(en): (COWI, Kongens Lyngby, Denmark)
(COWI, Göteborg, Sweden)
(COWI, Göteborg, Sweden)
(Trafikverket, Jönköping, Sweden)
Medium: Tagungsbeitrag
Sprache(n): Englisch
Tagung: IABSE Congress: Challenges in Design and Construction of an Innovative and Sustainable Built Environment, Stockholm, Sweden, 21-23 September 2016
Veröffentlicht in:
Seite(n): 1748-1755 Anzahl der Seiten (im PDF): 8
Seite(n): 1748-1755
Anzahl der Seiten (im PDF): 8
Jahr: 2016
DOI: 10.2749/stockholm.2016.1753
Abstrakt:

This paper presents the replacement of cable stays of the 33 years old Tjörn Bridge located in Sweden. The bridge has a main span 366 m and a total length of 664 m. The bridge has a locked coil cable system of 64 cables, where some cables have corroded with a number of wire failures. The reason is exposure to water and ice combined with insufficient drainage. The paper describes the full story from detecting the corrosion problem to restoring the safety of the bridge by replacing the cables in a safe way. The paper presents and discusses the history of inspection and identification of the corrosion problem and the challenges and solutions of the replacement of cables. As several cables had been ex-posed to a corrosion risk, the replacements carried out, required an in depth safety analyses to consider the strength of all cables

Stichwörter:
Korrosion Instandsetzung Sicherheit finite Elemente

Bauwerke und Projekte