0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

Reliability-Based Site-Specific Live Load Models for the Gordie Howe International Bridge

 Reliability-Based Site-Specific Live Load Models for the Gordie Howe International Bridge
Autor(en): , , ,
Beitrag für IABSE Congress: The Evolving Metropolis, New York, NY, USA, 4-6 September 2019, veröffentlicht in , S. 608-614
DOI: 10.2749/newyork.2019.0608
Preis: € 25,00 inkl. MwSt. als PDF-Dokument  
ZUM EINKAUFSWAGEN HINZUFÜGEN
Vorschau herunterladen (PDF-Datei) 0.19 MB

This paper discusses the development of project-specific live load models to achieve target reliability levels for the Gordie Howe International Bridge. This new bridge between Windsor, Ontario Can...
Weiterlesen

Bibliografische Angaben

Autor(en): (Parsons)
(Parsons)
(Michigan DOT)
(Windsor Detroit Bridge Authority)
Medium: Tagungsbeitrag
Sprache(n): Englisch
Tagung: IABSE Congress: The Evolving Metropolis, New York, NY, USA, 4-6 September 2019
Veröffentlicht in:
Seite(n): 608-614 Anzahl der Seiten (im PDF): 7
Seite(n): 608-614
Anzahl der Seiten (im PDF): 7
DOI: 10.2749/newyork.2019.0608
Abstrakt:

This paper discusses the development of project-specific live load models to achieve target reliability levels for the Gordie Howe International Bridge. This new bridge between Windsor, Ontario Canada and Detroit, Michigan USA will have a main span of 853 m (2800 ft), a design life of 125 years, and will experience atypical traffic patterns as a result of customs inspection plazas required at both ends of the bridge. Due to these variations relative to standard practice, large databases of weigh-in-motion data and simulation studies were used to modify the live load models of both country’s codes following the approach of NCHRP 683. The limit states addressed extend beyond the Strength 1 (ULS 1), to include high dead-to-live ratio combinations, and fatigue limit states.

Stichwörter:
Ermüdung Nutzungsdauer

Bauwerke und Projekte