0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

Railway Road Bridge in Novi Sad – Design and Erection

 Railway Road Bridge in Novi Sad – Design and Erection
Autor(en): , , , ,
Beitrag für IABSE Symposium: Engineering for Progress, Nature and People, Madrid, Spain, 3-5 September 2014, veröffentlicht in , S. 2163-2170
DOI: 10.2749/222137814814069480
Preis: € 25,00 inkl. MwSt. als PDF-Dokument  
ZUM EINKAUFSWAGEN HINZUFÜGEN
Vorschau herunterladen (PDF-Datei) 0.18 MB

The bridge is situated on the major international electrified railroad line No 2 (Belgrade-Budapest) and designed for to railway tracks (160 km/h), two road lanes and two footpaths, with the total...
Weiterlesen

Bibliografische Angaben

Autor(en):





Medium: Tagungsbeitrag
Sprache(n): Englisch
Tagung: IABSE Symposium: Engineering for Progress, Nature and People, Madrid, Spain, 3-5 September 2014
Veröffentlicht in:
Seite(n): 2163-2170 Anzahl der Seiten (im PDF): 8
Seite(n): 2163-2170
Anzahl der Seiten (im PDF): 8
Jahr: 2014
DOI: 10.2749/222137814814069480
Abstrakt:

The bridge is situated on the major international electrified railroad line No 2 (Belgrade-Budapest) and designed for to railway tracks (160 km/h), two road lanes and two footpaths, with the total width of 31,5 m. The bridge structure consists of four structures: two approach composite bridges at the banks and two steel tied network arch bridges over the river. The spans are 27,0 +177,0 + 3,0 + 219,0 + 48,0 m, totally 474,0 m in length. The heights of arches are 34,0 m and 42,0 m respectively. The arches and ties, as well as the girders of the approach spans, are steel box girders. The decks of the arch bridges are the composite reinforced concrete slabs with thickness of 300 mm. The launching itself is very complex and unique, in both analysis and construction. The arch bridges are fully assembled on the banks and launched by platforms and skids over the bank and by barges over the river, to the final position on piers.

Stichwörter:
Errichtung Vorschub Stabbogenbrücke dynamische Berechnung