0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

A proposition for a new construction method for cast-in-situ multi-span integral bridges

Autor(en):

Medium: Tagungsbeitrag
Sprache(n): Englisch
Tagung: 35th Annual Symposium of IABSE / 52nd Annual Symposium of IASS / 6th International Conference on Space Structures: Taller, Longer, Lighter - Meeting growing demand with limited resources, London, United Kingdom, September 2011
Veröffentlicht in:
Jahr: 2011
Abstrakt:

A new construction method for cast-in-situ bridges is examined. The method is proper for bridges with span lengths between 30 to 50 m. The construction of the bridge includes the following stages: Two balanced cantilevers are casted on both sides of the elevated piers. Each cantilever has a length equal to half of the corresponding span length of the bridge and is connected to the adjacent one at the mid-span. The height of the cross section of the deck is reduced from the support to the mid- span. The prestressing tendons are straight, while the reinforcements within the bottom flange of the deck consist of ordinary strength steel bars. The applicability of the proposed construction method has been examined to a real cast-in-situ box-girder bridge. Comparative results are illustrated showing that the proposed method has advantages concerning not only the constructability, but also the serviceability performance, the earthquake resistance and the structural cost of the bridge.

Stichwörter:
Brücke

Bauwerkstypen

Structurae kann Ihnen derzeit diese Veröffentlichung nicht im Volltext zur Verfügung stellen.
  • Über diese
    Datenseite
  • Reference-ID
    10065594
  • Veröffentlicht am:
    03.10.2011
  • Geändert am:
    05.07.2021
 
Structurae kooperiert mit
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine