0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

Proposal for a Submerged Floating Tube Bridge as part of the Bømlafjord crossing

 Proposal for a Submerged Floating Tube Bridge as part of the Bømlafjord crossing
Autor(en): , ,
Beitrag für IABSE Congress: Challenges in Design and Construction of an Innovative and Sustainable Built Environment, Stockholm, Sweden, 21-23 September 2016, veröffentlicht in , S. 1951-1955
DOI: 10.2749/stockholm.2016.1959
Preis: € 25,00 inkl. MwSt. als PDF-Dokument  
ZUM EINKAUFSWAGEN HINZUFÜGEN
Vorschau herunterladen (PDF-Datei) 0.19 MB

A proposal for a Submerged Floating Tube Bridge as part of a scheme for a new and improved fixed link along the E39 route, across the Bømlafjord in Norway, is presented.

The existing crossing...
Weiterlesen

Bibliografische Angaben

Autor(en): (Region West, Norwegian Public Road Administration, Norway)
(Road directorate, Norwegian Public Road Administration, Norway)
(Region West, Norwegian Public Road Administration, Norway)
Medium: Tagungsbeitrag
Sprache(n): Englisch
Tagung: IABSE Congress: Challenges in Design and Construction of an Innovative and Sustainable Built Environment, Stockholm, Sweden, 21-23 September 2016
Veröffentlicht in:
Seite(n): 1951-1955 Anzahl der Seiten (im PDF): 5
Seite(n): 1951-1955
Anzahl der Seiten (im PDF): 5
Jahr: 2016
DOI: 10.2749/stockholm.2016.1959
Abstrakt:

A proposal for a Submerged Floating Tube Bridge as part of a scheme for a new and improved fixed link along the E39 route, across the Bømlafjord in Norway, is presented.

The existing crossing is not able to satisfy the previsions of the increase in traffic and the new rules on the road alignment and gradient. The new requirements, including the need of a carriageway with two lanes for each direction, imply a complete replacement of the existing tunnel with a longer one. The possibility to substitute the new bridge, necessary for the northern part of the crossing, with a SFTB (Submerged Floating Tube Bridge) allow to reduce the parts of the tunnel in the southern part that have to be substituted. The advantages of the proposed scheme for the crossing are evaluated and discussed. A comparison, in terms of costs, of the different solutions for the design is presented.

Stichwörter:
Brücken Tunnel

Bauwerke und Projekte

Bauwerkstypen