0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

A procedure for prioritizing seismic risk reduction of load bearing masonry structures

A procedure for prioritizing seismic risk reduction of load bearing masonry structures
Autor(en): ,
Beitrag für IABSE Conference: Structural Engineering: Providing Solutions to Global Challenges, Geneva, Switzerland, September 2015, veröffentlicht in , S. 862-869
DOI: 10.2749/222137815818358006
Preis: € 25,00 inkl. MwSt. als PDF-Dokument  
ZUM EINKAUFSWAGEN HINZUFÜGEN
Vorschau herunterladen (PDF-Datei) 0.08 MB

Densely populated areas are subjected to significant risk if buildings are not designed for potential seismic events. This paper presents an approach for prioritizing the allocation of funds for se...
Weiterlesen

Bibliografische Angaben

Autor(en): (Stellenbosch University, South Africa)
(Stellenbosch University, South Africa)
Medium: Tagungsbeitrag
Sprache(n): Englisch
Tagung: IABSE Conference: Structural Engineering: Providing Solutions to Global Challenges, Geneva, Switzerland, September 2015
Veröffentlicht in:
Seite(n): 862-869 Anzahl der Seiten (im PDF): 8
Seite(n): 862-869
Anzahl der Seiten (im PDF): 8
Jahr: 2015
DOI: 10.2749/222137815818358006
Abstrakt:

Densely populated areas are subjected to significant risk if buildings are not designed for potential seismic events. This paper presents an approach for prioritizing the allocation of funds for seismic risk reduction of unreinforced masonry apartment facilities. The outcome would enable public authorities to decide where available funds should first be allocated for seismic risk reduction of such facilities.

The approach includes not only the structural capacity of the building, but the availability of emergency services, recovering potential of the community, and other factors. These were identified through discussions with local authority officials, through evaluation of previous studies on disaster risk management, and through examination of structural design code requirements.

The proposed model uses principle factors with weights identified from literature. Sub factors are defined and weighted with input from industry sources. Indicators identified from various sources are used as basis to score sub factors in an evaluation.

Stichwörter:
Gebäude unbewehrtes Mauerwerk