0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

Autor(en):
Medium: Tagungsbeitrag
Sprache(n): Englisch
Tagung: 35th Annual Symposium of IABSE / 52nd Annual Symposium of IASS / 6th International Conference on Space Structures: Taller, Longer, Lighter - Meeting growing demand with limited resources, London, United Kingdom, September 2011
Veröffentlicht in:
Jahr: 2011
Abstrakt:

The Mersey Gateway is a proposed scheme for a new crossing of the River Mersey upstream of the existing bridge at Runcorn. The scheme will be let as a Design Build Finance and Operate contract. A preliminary design for the scheme has been developed to determine the alignment and required structures to carry the new route over the Mersey Estuary. A family of structures has been developed for the approaches with a common them for finishes that compliments that of the main crossing. The crossing of the River Mersey will be a 4-span cable stayed structured with varying height towers. The outline design has been developed taking into account environmental and physical constraints and allowing for possible construction methods. The appearance of the bridge has been considered in some detail to determine the form of the cable stayed structure, including the deck, cable array and towers.

Bauwerke und Projekte

Structurae kann Ihnen derzeit diese Veröffentlichung nicht im Volltext zur Verfügung stellen.
  • Über diese
    Datenseite
  • Reference-ID
    10065520
  • Veröffentlicht am:
    03.10.2011
  • Geändert am:
    05.07.2021
 
Structurae kooperiert mit
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine