0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

Performance Evaluation of Off-Site Construction Method for Mass Housing Projects using Building Information Modelling (BIM) Approach

 Performance Evaluation of Off-Site Construction Method for Mass Housing Projects using Building Information Modelling (BIM) Approach
Autor(en): ,
Beitrag für IABSE Congress: Engineering for Sustainable Development, New Delhi, India, 20-22 September 2023, veröffentlicht in , S. 1233-1243
DOI: 10.2749/newdelhi.2023.1233
Preis: € 25,00 inkl. MwSt. als PDF-Dokument  
ZUM EINKAUFSWAGEN HINZUFÜGEN
Vorschau herunterladen (PDF-Datei) 1.08 MB

Mass housing is always in bulk and is referred to as mass housing and built by conventional method. However Modern methods of construction like Off-Site Construction (OSC) in mass housing has been ...
Weiterlesen

Bibliografische Angaben

Autor(en): (Department of Civil and Infrastructure Engineering, Indian Institute of Technology (IIT} Dharwad, Dharwad- 580011, Karnataka State, Bharat)
(Department of Civil Engineering, National Institute of Technology (NIT} Warangal, Hanamkonda, 506004, Telangana State, Bharat)
Medium: Tagungsbeitrag
Sprache(n): Englisch
Tagung: IABSE Congress: Engineering for Sustainable Development, New Delhi, India, 20-22 September 2023
Veröffentlicht in:
Seite(n): 1233-1243 Anzahl der Seiten (im PDF): 11
Seite(n): 1233-1243
Anzahl der Seiten (im PDF): 11
DOI: 10.2749/newdelhi.2023.1233
Abstrakt:

Mass housing is always in bulk and is referred to as mass housing and built by conventional method. However Modern methods of construction like Off-Site Construction (OSC) in mass housing has been researched very limited. In this context, this study attempted to use building information modelling (BIM) to evaluate the performance of OSC in mass housing projects. In this study BIM models of base and OSC developed and evaluated cost and time. Besides, COVID-19 impact on project also reported. The investigation results shown the cost effective of OSC in mass housing projects proven to be significant in terms of project time and cost savings by 67% and 23%, respectively. Nevertheless, this study contributes to the body of knowledge and may set guidelines for housing policy makers and construction practitioners with an option of adopting OSC and use of BIM to minimize overall project timeline and optimize the workforce.

Stichwörter:
Tragverhalten Kosten