0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

Pedestrian bridge over the River Elbe in Hradec Králové

 Pedestrian bridge over the River Elbe in Hradec Králové
Autor(en): , , , ,
Beitrag für IABSE Symposium: Challenges for Existing and Oncoming Structures, Prague, Czech Republic, 25-27 May 2022, veröffentlicht in , S. 1047-1052
DOI: 10.2749/prague.2022.1047
Preis: € 25,00 inkl. MwSt. als PDF-Dokument  
ZUM EINKAUFSWAGEN HINZUFÜGEN
Vorschau herunterladen (PDF-Datei) 0.21 MB

The new bridge over the Elbe River will be a rather unusual structure made of modern materials. The design solution is truly a challenge for the architects, designers and the contractor and require...
Weiterlesen

Bibliografische Angaben

Autor(en): (SMP CZ a.s., Prague, Czech Republic)
(SMP CZ a.s., Prague, Czech Republic)
(SMP CZ a.s., Prague, Czech Republic)
(VALBEK spol. s r.o., Prague, Czech Republic)
(VALBEK spol. s r.o., Prague, Czech Republic)
(GEM.VISION, Prague, Czech Republic)
(GEM.VISION, Prague, Czech Republic)
(GEM.VISION, Prague, Czech Republic)
(REDAELLI TECNA S.p.A., Milano, Italy)
Medium: Tagungsbeitrag
Sprache(n): Englisch
Tagung: IABSE Symposium: Challenges for Existing and Oncoming Structures, Prague, Czech Republic, 25-27 May 2022
Veröffentlicht in:
Seite(n): 1047-1052 Anzahl der Seiten (im PDF): 6
Seite(n): 1047-1052
Anzahl der Seiten (im PDF): 6
DOI: 10.2749/prague.2022.1047
Abstrakt:

The new bridge over the Elbe River will be a rather unusual structure made of modern materials. The design solution is truly a challenge for the architects, designers and the contractor and requires their close cooperation. In its final statical scheme, the structure forms a virtual Vierendeel truss of variable height. The designing of the structure involves the necessity to cope with many complex details, which are often beyond the limits of applicable design standards and regulations. The contractor will use uncommon technologies for construction of the structure. These methods will facilitate the installation process while carrying an ecological aspect.

Stichwörter:
Schnittgrößenermittlung Fußgängerbrücke Bauprozeß Stahlbauwerk / -konstruktion Vierendeelträger UHPFRC
Copyright: © 2022 International Association for Bridge and Structural Engineering (IABSE)
Lizenz:

Die Urheberrechte (Copyright) für dieses Werk sind rechtlich geschützt. Es darf nicht ohne die Zustimmung des Autors/der Autorin oder Rechteinhabers/-in weiter benutzt werden.