Numerical Analysis of Top-Down Construction Method of High-Rise Buildings and its Effects on Substructures with their Corresponding Heights

 Numerical Analysis of Top-Down Construction Method of High-Rise Buildings and its Effects on Substructures with their Corresponding Heights
Autor(en): ,
Beitrag für IABSE Congress: Bridges and Structures: Connection, Integration and Harmonisation, Nanjing, People's Republic of China, 21-23 September 2022, veröffentlicht in , S. 902-911
DOI: 10.2749/nanjing.2022.0902
Preis: € 25,00 inkl. MwSt. als PDF-Dokument  
ZUM EINKAUFSWAGEN HINZUFÜGEN
Vorschau herunterladen (PDF-Datei) 0.15 MB

The Top-Down construction method has been used widely in urban areas, particularly in high-rise buildings with basements. This paper presents the Nanjing Jinmao Plaza II Tower in Nanjing-China as a...
Weiterlesen

Bibliografische Angaben

Autor(en): (School of Civil Engineering, Southeast University, Nanjing 210096, China)
(School of Civil Engineering, Southeast University, Nanjing 210096, China)
Medium: Tagungsbeitrag
Sprache(n): Englisch
Tagung: IABSE Congress: Bridges and Structures: Connection, Integration and Harmonisation, Nanjing, People's Republic of China, 21-23 September 2022
Veröffentlicht in:
Seite(n): 902-911 Anzahl der Seiten (im PDF): 10
Seite(n): 902-911
Anzahl der Seiten (im PDF): 10
DOI: 10.2749/nanjing.2022.0902
Abstrakt:

The Top-Down construction method has been used widely in urban areas, particularly in high-rise buildings with basements. This paper presents the Nanjing Jinmao Plaza II Tower in Nanjing-China as a case study, which consists of 68 floors with a height of 283.6 m and five basements with a depth of 27.5 m. A numerical finite element simulation in PLAXIS 3D was performed to analyze the construction of soil excavation and basement structure and their corresponding heights. The study concluded that the effect of adding floors to the superstructure had little effect on the underground excavation process. Likewise, the condition of column piles is in different stages of construction. In view of that, this paper has analyzed and summarized construction guidelines for the top-down construction method to ensure safety, optimize design, and provide recommendations for this promising construction technique.

Stichwörter:
Hochhaus Verschiebung Verformung Deformation
Copyright: © 2022 International Association for Bridge and Structural Engineering (IABSE)
Lizenz:

Die Urheberrechte (Copyright) für dieses Werk sind rechtlich geschützt. Es darf nicht ohne die Zustimmung des Autors/der Autorin oder Rechteinhabers/-in weiter benutzt werden.