0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

New Old-Fashioned-Style Lattice Footbridge and Retrofitting of a Masonry Arch Bridge in the Ticino Natural Park

 New Old-Fashioned-Style Lattice Footbridge and Retrofitting of a Masonry Arch Bridge in the Ticino Natural Park
Autor(en): , ,
Beitrag für IABSE Symposium: Large Structures and Infrastructures for Environmentally Constrained and Urbanised Areas, Venice, Italy, 22-24 September 2010, veröffentlicht in , S. 538-539
DOI: 10.2749/222137810796025780
Preis: € 25,00 inkl. MwSt. als PDF-Dokument  
ZUM EINKAUFSWAGEN HINZUFÜGEN
Vorschau herunterladen (PDF-Datei) 0.16 MB

The project for adapting SP527 carriageway (Novara Province, Piemonte Region, Italy) has as its aim improving local roads network connection with Milan Malpensa airport. The Ticino Natural Park is ...
Weiterlesen

Bibliografische Angaben

Autor(en):


Medium: Tagungsbeitrag
Sprache(n): Englisch
Tagung: IABSE Symposium: Large Structures and Infrastructures for Environmentally Constrained and Urbanised Areas, Venice, Italy, 22-24 September 2010
Veröffentlicht in:
Seite(n): 538-539 Anzahl der Seiten (im PDF): 8
Seite(n): 538-539
Anzahl der Seiten (im PDF): 8
Jahr: 2010
DOI: 10.2749/222137810796025780
Abstrakt:

The project for adapting SP527 carriageway (Novara Province, Piemonte Region, Italy) has as its aim improving local roads network connection with Milan Malpensa airport. The Ticino Natural Park is fully interested by this project: environmental aspects become the most important. In the current SP527, two 19th-century infrastructures stand out: a steel lattice bridge over the Ticino river and a masonry 3-arch bridge over the Bragadano canal.

A new footbridge is needed, at the side of the existing arch bridge; it has a "celosía"-lattice theme, reminding the historical bridge aspect. Structural design is made together with the dynamic verification and pedestrians comfort. The masonry arch bridge must be retrofitted without modifying its formal appearance. The existing structure will be used for a direct vertical loads transfer onto the piers. The project is going through its detailed design phase.

Stichwörter:
Beulanalyse

Bauwerke und Projekte