0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

Monitoring fatigue effects in an orthotropic steel bridge deck

 Monitoring fatigue effects in an orthotropic steel bridge deck
Autor(en): , , , , ORCID
Beitrag für IABSE Conference: Assessment, Upgrading and Refurbishment of Infrastructures, Rotterdam, The Netherlands, 6-8 May 2013, veröffentlicht in , S. 506-507
DOI: 10.2749/222137813806521270
Preis: € 25,00 inkl. MwSt. als PDF-Dokument  
ZUM EINKAUFSWAGEN HINZUFÜGEN
Vorschau herunterladen (PDF-Datei) 0.45 MB

The effect of fatigue is particularly relevant in steel bridges since the influence of traffic load cycles on serviceability limit stress values is very high if compared to relatively low dead weig...
Weiterlesen

Bibliografische Angaben

Autor(en):



ORCID


Medium: Tagungsbeitrag
Sprache(n): Englisch
Tagung: IABSE Conference: Assessment, Upgrading and Refurbishment of Infrastructures, Rotterdam, The Netherlands, 6-8 May 2013
Veröffentlicht in:
Seite(n): 506-507 Anzahl der Seiten (im PDF): 8
Seite(n): 506-507
Anzahl der Seiten (im PDF): 8
Jahr: 2013
DOI: 10.2749/222137813806521270
Abstrakt:

The effect of fatigue is particularly relevant in steel bridges since the influence of traffic load cycles on serviceability limit stress values is very high if compared to relatively low dead weights.

Orthotropic steel decks, directly subjected to traffic loads, are very sensitive to fatigue: in most cases, fatigue defects appear as cracks in the top plates, longitudinal ribs and the bracing of the deck. In this paper the case study of a 20 years old box girder bridge affected by fatigue problems is presented: the bridge has an orthotropic steel deck with three spans whose total length is 152m. The bridge is located in one of the busiest Italian highways, the “Milan-Venice” A4 highway, characterized by high volumes of heavy truck loads. After the cracks appeared on the longitudinal welding of the ribs, a dynamic identification campaign was carried out using piezoelectric accelerometers, and a monitoring system was then installed by positioning 54 strain-gauges along one of the steel decks of the bridge.

The results of the monitoring campaign are here presented, underlining the deficiencies of the original design, and a retrofit interventions are proposed for the bridge deck.

Stichwörter:
Ermüdung orthotrope Stahlfahrbahnen Stahlbrücken Retrofit