The Modular Expansion Joints of the Sheikh Jaber Causeway in Kuwait
|
Bibliografische Angaben
Autor(en): |
Achilleas Athanasiou
(Mageba SA, Bulach, Switzerland)
Niculin Meng (Mageba SA, Bulach, Switzerland) Colm O'Suilleabhain (Mageba SA, Bulach, Switzerland) |
||||
---|---|---|---|---|---|
Medium: | Tagungsbeitrag | ||||
Sprache(n): | Englisch | ||||
Tagung: | IABSE Symposium: Tomorrow’s Megastructures, Nantes, France, 19-21 September 2018 | ||||
Veröffentlicht in: | IABSE Symposium Nantes 2018 | ||||
|
|||||
Seite(n): | S1-9 | ||||
Anzahl der Seiten (im PDF): | 7 | ||||
DOI: | 10.2749/nantes.2018.s1-9 | ||||
Abstrakt: |
When completed in 2018, the Main Link of the Sheikh Jaber Al-Ahmad Al-Sabah Causeway in Kuwait will be one of the longest sea bridges in the world, with a length of 36 km. The project to supply many of the expansion joints required presented significant challenges, including ensuring durability, designing with extra-low height, and supplying – with ex-works lengths of up to 25.4 m – within the limited time period allowed by the bridge construction contract. |
||||
Stichwörter: |
Entwurf Brücke Fahrbahnübergänge
|