0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

Modelling techniques and processes used on the recalculation of the Friedrich-Ebert suspension bridge in Germany

 Modelling techniques and processes used on the recalculation of the Friedrich-Ebert suspension bridge in Germany
Autor(en): ,
Beitrag für IABSE Symposium: Long Span Bridges, Istanbul, Turkey, 26-28 April 2023, veröffentlicht in , S. 60-68
DOI: 10.2749/istanbul.2023.0060
Preis: € 25,00 inkl. MwSt. als PDF-Dokument  
ZUM EINKAUFSWAGEN HINZUFÜGEN
Vorschau herunterladen (PDF-Datei) 0.48 MB

The more complex the bridge is, the stronger the engineer’s technical knowledge needs to be to understand its behavior and lead the design towards a safe, functional, and cost-effective structure. ...
Weiterlesen

Bibliografische Angaben

Autor(en): (Arup Deutschland GmbH Düsseldorf, Germany)
(Arup Deutschland GmbH Düsseldorf, Germany)
Medium: Tagungsbeitrag
Sprache(n): Englisch
Tagung: IABSE Symposium: Long Span Bridges, Istanbul, Turkey, 26-28 April 2023
Veröffentlicht in:
Seite(n): 60-68 Anzahl der Seiten (im PDF): 9
Seite(n): 60-68
Anzahl der Seiten (im PDF): 9
Jahr: 2023
DOI: 10.2749/istanbul.2023.0060
Abstrakt:

The more complex the bridge is, the stronger the engineer’s technical knowledge needs to be to understand its behavior and lead the design towards a safe, functional, and cost-effective structure. The bridge design industry shows, however, that technical knowledge is not enough: engineers not only have to master a whole range of technical subjects, but also need to be able to manage and treat data to understand and interpret results. This is the only way to make the right decisions in a conscious way. In the case of long span bridges, management and processing of information becomes critical since the amount of data increases with the span length. This paper showcases some modelling techniques and processes used to carry out the recalculation of the Friedrich-Ebert bridge in 2021, that were found essential to capture and analyze, in an accurate way, its almost 70 years of history, including the strengthening that took place in 2000, and that enabled a precise rating of a bridge with a main span length of more than 285m over the Rhine River. Techniques touch upon input of complex geometry, consideration of shear lag, checks on plate buckling and the so-called contribution charts. The ir application lead ultimately to the preservation of this beautiful landmark.

Stichwörter:
Analyse Nachrechnung

Bauwerke und Projekte