0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

Minimization of Life Cycle Cost for Bridge Asset Management with Multi Stage Optimization

 Minimization of Life Cycle Cost for Bridge Asset Management with Multi Stage Optimization
Autor(en): , , , ,
Beitrag für IABSE Conference: Structural Engineering: Providing Solutions to Global Challenges, Geneva, Switzerland, September 2015, veröffentlicht in , S. 937-944
DOI: 10.2749/222137815818358141
Preis: € 25,00 inkl. MwSt. als PDF-Dokument  
ZUM EINKAUFSWAGEN HINZUFÜGEN
Vorschau herunterladen (PDF-Datei) 0.09 MB

The purpose of this study is to minimize life cycle cost (LCC) for bridge asset management. This study attempts to develop an optimization method for bridge maintenance planning. It is realisticall...
Weiterlesen

Bibliografische Angaben

Autor(en): (Kansai University, Osaka, JPN)
(Ritsumeikan University, Shiga, JPN)
(Jonan Women’s Junior College, Osaka, JPN)
(Kansai University, Osaka, JPN)
(Kansai University, Osaka, JPN)
Medium: Tagungsbeitrag
Sprache(n): Englisch
Tagung: IABSE Conference: Structural Engineering: Providing Solutions to Global Challenges, Geneva, Switzerland, September 2015
Veröffentlicht in:
Seite(n): 937-944 Anzahl der Seiten (im PDF): 8
Seite(n): 937-944
Anzahl der Seiten (im PDF): 8
Jahr: 2015
DOI: 10.2749/222137815818358141
Abstrakt:

The purpose of this study is to minimize life cycle cost (LCC) for bridge asset management. This study attempts to develop an optimization method for bridge maintenance planning. It is realistically difficult to keep the safety level of all bridges within a limited budget. Furthermore, a local government needs to manage a large number of bridges. These cause the difficulty of optimization such as the increase of the number of bridges and strict constraint conditions. However, an optimization of maintenance plan for multiple bridges is significant to decrease an annual total cost. Hence, this paper proposes a new method to formulate a maintenance plan, which has the flexibility against uncertainties that involve the change of schedule, by multi-stage optimization that consider an appropriate budget allocation based on each bridge’s importance. Several numerical examples are presented to demonstrate the effectiveness for the planning of LCC minimized maintenance.

Stichwörter:
Lebenszykluskosten