0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

A method for replacing lower flange splice plate of a steel I-girder connection using BPL

A method for replacing lower flange splice plate of a steel I-girder connection using BPL
Autor(en): , , , ,
Beitrag für IABSE Congress: Structural Engineering for Future Societal Needs, Ghent, Belgium, 22-24 September 2021, veröffentlicht in , S. 1754-1760
DOI: 10.2749/ghent.2021.1754
Preis: € 25,00 inkl. MwSt. als PDF-Dokument  
ZUM EINKAUFSWAGEN HINZUFÜGEN
Vorschau herunterladen (PDF-Datei) 0.23 MB

In recent years, corrosion damages of the steel I-girder bridge joints have been reported. With the increasing demand for the replacement of splice plates of the damaged joints, good workability wi...
Weiterlesen

Bibliografische Angaben

Autor(en): (Graduate student & Professor, Osaka City University, Osaka, Japan)
(Graduate student & Professor, Osaka City University, Osaka, Japan)
(Professional Engineer, MM BRIDGE CO. LTD., Hiroshima, Japan)
(Professional Engineer, MM BRIDGE CO. LTD., Hiroshima, Japan)
(Professional Engineer, MM BRIDGE CO. LTD., Hiroshima, Japan)
Medium: Tagungsbeitrag
Sprache(n): Englisch
Tagung: IABSE Congress: Structural Engineering for Future Societal Needs, Ghent, Belgium, 22-24 September 2021
Veröffentlicht in:
Seite(n): 1754-1760 Anzahl der Seiten (im PDF): 7
Seite(n): 1754-1760
Anzahl der Seiten (im PDF): 7
DOI: 10.2749/ghent.2021.1754
Abstrakt:

In recent years, corrosion damages of the steel I-girder bridge joints have been reported. With the increasing demand for the replacement of splice plates of the damaged joints, good workability without using temporary supports is required when considering the cost and time necessary to execute such works. In the present study, FEM analysis has been conducted in order to propose a new replacing method for the lower flange splice plates in steel I-girder, which uses a bypass device of steel plate named BPL that is attached to the web panel. From the analytical results, it has been confirmed that using the BPL and replacing the lower flange splice plates, the stress at the lower flange splice plates is transferred to the BPL and redistributed to the new lower flange splice plates after the removal of BPL. It has also been clarified the geometrical configuration of the BPL that can reduce the stress at the web effectively during replacement of the lower flange splice plates.

Stichwörter:
FEM-Untersuchung
Copyright: © 2021 International Association for Bridge and Structural Engineering (IABSE)
Lizenz:

Die Urheberrechte (Copyright) für dieses Werk sind rechtlich geschützt. Es darf nicht ohne die Zustimmung des Autors/der Autorin oder Rechteinhabers/-in weiter benutzt werden.