0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

Key Technology for the Design of a Cable-Stayed Bridge in a High- Intensity Area

 Key Technology for the Design of a Cable-Stayed Bridge in a High- Intensity Area
Autor(en): ,
Beitrag für IABSE Congress: Bridges and Structures: Connection, Integration and Harmonisation, Nanjing, People's Republic of China, 21-23 September 2022, veröffentlicht in , S. 208-215
DOI: 10.2749/nanjing.2022.0208
Preis: € 25,00 inkl. MwSt. als PDF-Dokument  
ZUM EINKAUFSWAGEN HINZUFÜGEN
Vorschau herunterladen (PDF-Datei) 0.18 MB

The background project is Xiyan Bridge, Pingcheng Street, Datong city, Shanxi Province. The bridge crosses both railway marshalling yards and multiple important railway lines. The span arrangement ...
Weiterlesen

Bibliografische Angaben

Autor(en): (Architectural Design & Research Institute of Tongji University (Group) Co., Ltd, Shanghai, China)
(Architectural Design & Research Institute of Tongji University (Group) Co., Ltd, Shanghai, China)
Medium: Tagungsbeitrag
Sprache(n): Englisch
Tagung: IABSE Congress: Bridges and Structures: Connection, Integration and Harmonisation, Nanjing, People's Republic of China, 21-23 September 2022
Veröffentlicht in:
Seite(n): 208-215 Anzahl der Seiten (im PDF): 8
Seite(n): 208-215
Anzahl der Seiten (im PDF): 8
DOI: 10.2749/nanjing.2022.0208
Abstrakt:

The background project is Xiyan Bridge, Pingcheng Street, Datong city, Shanxi Province. The bridge crosses both railway marshalling yards and multiple important railway lines. The span arrangement is (41+50+163) m. The overall design, key structure design and calculation of the main bridge are introduced in detail for high intensity areas and for large spans with width and bidirectional asymmetric main girders. The main point is placed on the comparison, selection and analysis of the main tower as an all-steel structure and steel-concrete composite structure for its seismic system design. The linear control, weighing and counterweight scheme are simulated for the main construction process of the whole bridge without setting up the closing section of a rotating body on site. The calculation proves that the structure design is reasonable and that the construction is safe and reliable. It can provide a reference for the design and construction of similar bridges.

Copyright: © 2022 International Association for Bridge and Structural Engineering (IABSE)
Lizenz:

Die Urheberrechte (Copyright) für dieses Werk sind rechtlich geschützt. Es darf nicht ohne die Zustimmung des Autors/der Autorin oder Rechteinhabers/-in weiter benutzt werden.

Bauwerke und Projekte