IZMIT Bay Suspension Bridge, Erection of Steel Tower
|
Bibliografische Angaben
Autor(en): |
Mitsuhiro Yamane
Mitsuhiro Kudo Naonori Asai Takusen Mutaguchi Masashi Kan'O Shinjiro Seki |
||||
---|---|---|---|---|---|
Medium: | Tagungsbeitrag | ||||
Sprache(n): | Englisch | ||||
Tagung: | IABSE Symposium: Engineering for Progress, Nature and People, Madrid, Spain, 3-5 September 2014 | ||||
Veröffentlicht in: | IABSE Symposium Madrid 2014 | ||||
|
|||||
Seite(n): | 2081-2088 | ||||
Anzahl der Seiten (im PDF): | 8 | ||||
Jahr: | 2014 | ||||
DOI: | 10.2749/222137814814068409 | ||||
Abstrakt: |
The construction of the Izmit Bay Suspension Bridge has started in January 2013 to be completed early 2016. The tower is steel construction reaching over 246.5m above sea level and being constructed with floating cranes for the lower part and self-climbing crane for the upper part to be completed by end of 2014, followed by the cable erection in 2015. The papers describe the construction of the tower of the Izmit Bay Suspension Bridge. |
||||
Stichwörter: |
Hängebrücke
|