Inspection of the Source of the Nile Bridge
|
Bibliografische Angaben
Autor(en): |
Mark de Melo
(Arup, Birmingham, United Kingdom)
Diana Ciurte (Arup, Birmingham, United Kingdom) Kulvinder Rayat (Arup, Birmingham, United Kingdom) |
||||
---|---|---|---|---|---|
Medium: | Tagungsbeitrag | ||||
Sprache(n): | Englisch | ||||
Tagung: | IABSE Symposium: Long Span Bridges, Istanbul, Turkey, 26-28 April 2023 | ||||
Veröffentlicht in: | IABSE Symposium Istanbul 2023 | ||||
|
|||||
Seite(n): | 52-59 | ||||
Anzahl der Seiten (im PDF): | 8 | ||||
Jahr: | 2023 | ||||
DOI: | 10.2749/istanbul.2023.0052 | ||||
Abstrakt: |
This paper describes the methodology used to inspect the Source of the Nile Bridge in Uganda. It is a 525m cable-stayed bridge opened to traffic in October 2018. It replaces the existing Nalubaale Dam/Bridge as the major crossing point across the River Nile at Jinja in the Eastern Region of Uganda. Arup, working for the Uganda National Roads Authority (UNRA), carried out a visual inspection of the Source of the Nile Bridge as part of the handover. The inspection methodology involved using a bespoke web application accessed from a smartphone to record the visual inspection. The app enabled successful completion of the inspection in a limited time frame and following strict client standards for data collection and reporting of condition. Observations and records were stored in a database hosted in the cloud. This enabled results to be summarised and presented using a cloud-based web interface employing tables and dashboards. The outcome was an intuitive interface which offers an opportunity for continual monitoring of the structures condition over its lifetime. |
||||
Stichwörter: |
Wartung
|