0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

Innovative Geometry Control Techniques for Complex Bridge Construction

 Innovative Geometry Control Techniques for Complex Bridge Construction
Autor(en): ,
Beitrag für IABSE Congress: Beyond Structural Engineering in a Changing World, San José, Cost Rica, 25-27 Seotember 2024, veröffentlicht in , S. 1374-1383
DOI: 10.2749/sanjose.2024.1374
Preis: € 25,00 inkl. MwSt. als PDF-Dokument  
ZUM EINKAUFSWAGEN HINZUFÜGEN
Vorschau herunterladen (PDF-Datei) 0.55 MB

Complex bridges, including cable-stayed and arc-supported structures, require meticulous planning and control during staged construction to maintain adherence to the original design. Deviations due...
Weiterlesen

Bibliografische Angaben

Autor(en): (SOFiN Consulting Ltd, Espoo, Finland)
(SOFiSTiK AG, Graz, Austria)
Medium: Tagungsbeitrag
Sprache(n): Englisch
Tagung: IABSE Congress: Beyond Structural Engineering in a Changing World, San José, Cost Rica, 25-27 Seotember 2024
Veröffentlicht in:
Seite(n): 1374-1383 Anzahl der Seiten (im PDF): 10
Seite(n): 1374-1383
Anzahl der Seiten (im PDF): 10
DOI: 10.2749/sanjose.2024.1374
Abstrakt:

Complex bridges, including cable-stayed and arc-supported structures, require meticulous planning and control during staged construction to maintain adherence to the original design. Deviations due to erection errors, tolerance effects, or survey discrepancies pose significant challenges.

This study introduces innovative geometry control applications, illustrated by the Thu Thiem 2 bridge in Ho Chi Minh City, Vietnam. Initially fixed construction plans, including camber and cable stressing forces, were dynamically adjusted in response to real-time deviations and load changes. A critical innovation, the "KINK" feature, was developed to integrate survey data and correct cumulative installation errors, improving the fidelity of the 'as-built' analysis, and allowing for proactive design modifications.

Our research enhances the precision and efficiency of bridge construction and supports improved collaboration among stakeholders.