0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

An Initialization Model with Reference to Finite Number of Failures

An Initialization Model with Reference to Finite Number of Failures
Autor(en): , , ,
Beitrag für IABSE Symposium: Tomorrow’s Megastructures, Nantes, France, 19-21 September 2018, veröffentlicht in , S. S5-165
DOI: 10.2749/nantes.2018.s5-165
Preis: € 25,00 inkl. MwSt. als PDF-Dokument  
ZUM EINKAUFSWAGEN HINZUFÜGEN
Vorschau herunterladen (PDF-Datei) 0.29 MB

In order to manage the expressway assets, it is important to properly predict the scale of failures occurring in infrastructures in future. In this paper, the authors propose an initialization time...
Weiterlesen

Bibliografische Angaben

Autor(en): (West Nippon Expressway Engineering Chugoku Co., Ltd., Hiroshima, Japan)
(Kyoto University, Graduate School of Management, Kyoto, Japan)
(Osaka University, Graduate School of Engineering, Osaka, Japan)
(Osaka University, Graduate School of Engineering, Osaka, Japan)
Medium: Tagungsbeitrag
Sprache(n): Englisch
Tagung: IABSE Symposium: Tomorrow’s Megastructures, Nantes, France, 19-21 September 2018
Veröffentlicht in:
Seite(n): S5-165 Anzahl der Seiten (im PDF): 8
Seite(n): S5-165
Anzahl der Seiten (im PDF): 8
DOI: 10.2749/nantes.2018.s5-165
Abstrakt:

In order to manage the expressway assets, it is important to properly predict the scale of failures occurring in infrastructures in future. In this paper, the authors propose an initialization time model to predict the scale of failures. Specifically, the number of latent failure places where there are possibility of failure occurrence is assumed to be followed to Poisson distribution. Furthermore, a time-dependent probability of a failure occurrence in latent failure places is expressed by using Weibull deterioration hazard model. In consequence, an initialization time model is formulated as a mixed probability model. Lastly, the authors discuss the usefulness of the model in this study through the empirical analysis of actual expressway assets.

Stichwörter:
Brücke