0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

Independent Design Checking of Brahmaputra Bridge, Guwahati - Sharing Experience & Lessons Learnt

 Independent Design Checking of Brahmaputra Bridge, Guwahati - Sharing Experience & Lessons Learnt
Autor(en): ,
Beitrag für IABSE Congress: Engineering for Sustainable Development, New Delhi, India, 20-22 September 2023, veröffentlicht in , S. 156-163
DOI: 10.2749/newdelhi.2023.0156
Preis: € 25,00 inkl. MwSt. als PDF-Dokument  
ZUM EINKAUFSWAGEN HINZUFÜGEN
Vorschau herunterladen (PDF-Datei) 0.99 MB

The new bridge over river Brahmaputra connecting Guwahati and North Guwahati is currently in the advanced stages of construction. Designed to be an iconic bridge with state-of-the-art aesthetic fea...
Weiterlesen

Bibliografische Angaben

Autor(en): (Managing Director, B&S Engineering Consultants Pvt. Ltd.)
(Senior Project Manager, B&S Engineering Consultants Pvt. Ltd.)
Medium: Tagungsbeitrag
Sprache(n): Englisch
Tagung: IABSE Congress: Engineering for Sustainable Development, New Delhi, India, 20-22 September 2023
Veröffentlicht in:
Seite(n): 156-163 Anzahl der Seiten (im PDF): 8
Seite(n): 156-163
Anzahl der Seiten (im PDF): 8
DOI: 10.2749/newdelhi.2023.0156
Abstrakt:

The new bridge over river Brahmaputra connecting Guwahati and North Guwahati is currently in the advanced stages of construction. Designed to be an iconic bridge with state-of-the-art aesthetic features, it is being built at a cost of INR 26 billion (USD 316 million). This mega project includes not only the river bridge over the mighty river Brahmaputra but also long elevated viaducts and approaches on both sides. The project is being executed in EPC mode. The paper brings to the fore the culture of proof checking generally performed in infrastructure projects in the country and describes the unique feature of IDC performed in this specific project. The author draws on his own experience as well as published information to illustrate the importance of establishing a culture of independent checking everywhere to add confidence and mitigate the risk of failures.

Stichwörter:
Extradosed-Brücke Schrägseile Pfahlgründung Brunnengründung