Hernani Viaduct over the Urumea River. A cable stayed bridge for the high speed railway

 Hernani Viaduct over the Urumea River. A cable stayed bridge for the high speed railway
Autor(en): ,
Beitrag für IABSE Symposium: Engineering for Progress, Nature and People, Madrid, Spain, 3-5 September 2014, veröffentlicht in , S. 2118-2123
DOI: 10.2749/222137814814068661
Preis: € 25,00 inkl. MwSt. als PDF-Dokument  
ZUM EINKAUFSWAGEN HINZUFÜGEN
Vorschau herunterladen (PDF-Datei) 0.19 MB

Hernani Viaduct is a 1226 long viaduct with two cable stayed spans of 120 m and 67.7 m. It will become the first cable stayed bridge for HSR (High Speed Railway) in Spain. Construction started in 2...
Weiterlesen

Bibliografische Angaben

Autor(en):

Medium: Tagungsbeitrag
Sprache(n): Englisch
Tagung: IABSE Symposium: Engineering for Progress, Nature and People, Madrid, Spain, 3-5 September 2014
Veröffentlicht in:
Seite(n): 2118-2123 Anzahl der Seiten (im PDF): 6
Seite(n): 2118-2123
Anzahl der Seiten (im PDF): 6
Jahr: 2014
DOI: 10.2749/222137814814068661
Abstrakt:

Hernani Viaduct is a 1226 long viaduct with two cable stayed spans of 120 m and 67.7 m. It will become the first cable stayed bridge for HSR (High Speed Railway) in Spain. Construction started in 2013 and will be finished by the end of 2015.

Hernani Viaduct is part of the access railway line to San Sebastian in the North of Spain. This 1226 m long viaduct runs parallel to the Urumea River, crossing it three times with increasing spans (39,

67.7 and 120 m) due to skew angle. Structure depth is limited by 500 year return period flood water level to 1.10 m below railway platform. This depth restriction forces us to adopt singular U shaped deck section and to add cable stayed superstructure for the 67.7 and 120 m spans. Construction is carried out using falsework. Temporary piers are placed every 30 m in the main spans and removed after cable stayed tensioning.