0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

The Great Belt Link: Establishment of lifetime models

The Great Belt Link: Establishment of lifetime models
Autor(en):
Beitrag für IABSE Conference: Assessment, Upgrading and Refurbishment of Infrastructures, Rotterdam, The Netherlands, 6-8 May 2013, veröffentlicht in , S. 414-415
DOI: 10.2749/222137813806501911
Preis: € 25,00 inkl. MwSt. als PDF-Dokument  
ZUM EINKAUFSWAGEN HINZUFÜGEN
Vorschau herunterladen (PDF-Datei) 0.09 MB

The 18 km long fixed link crossing the Great Belt comprises two bridges and a tunnel: a 6.8 km suspension bridge, a 6.6 km combined road- and railway bridge and an 8 km long bored (twin) tunnel. Th...
Weiterlesen

Bibliografische Angaben

Autor(en):
Medium: Tagungsbeitrag
Sprache(n): Englisch
Tagung: IABSE Conference: Assessment, Upgrading and Refurbishment of Infrastructures, Rotterdam, The Netherlands, 6-8 May 2013
Veröffentlicht in:
Seite(n): 414-415 Anzahl der Seiten (im PDF): 8
Seite(n): 414-415
Anzahl der Seiten (im PDF): 8
Jahr: 2013
DOI: 10.2749/222137813806501911
Abstrakt:

The 18 km long fixed link crossing the Great Belt comprises two bridges and a tunnel: a 6.8 km suspension bridge, a 6.6 km combined road- and railway bridge and an 8 km long bored (twin) tunnel. The Great Belt Link was designed for a service life of 100 years, and to ensure this, an investigation has been carried out to establish lifetime models for the primary concrete structures. Existing reports from routine, principal and special inspections were analysed. Special focus on moist conditions, chloride ingress, air void structure, crack extent and chloride initiated reinforcement corrosion were some of the deterioration mechanisms used in determining the life time service. Primary and secondary deterioration mechanisms were identified, critical areas defined and future operation and maintenance plans for securing a technical and economical operation were drawn up. Recent results from special inspection with particular focus on corrosion in cracks, establishment of cathodic protection systems, potential frost related damages and surface treatment of critical areas are presented in the paper. Cores taken from the critical areas further indicate that special attention should be concentrated at areas with cracked concrete. The results of these investigations clearly indicate that the critical areas apparently only include areas in and around the splash zone and other distinct potential critical areas. This paper will outline some of the investigations used in establishing a lifetime model.

Bauwerke und Projekte