0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

Generating Historical Condition Ratings for the Reliable Prediction of Bridge Deteriorations

 Generating Historical Condition Ratings for the Reliable Prediction of Bridge Deteriorations
Autor(en): , , , ,
Beitrag für IABSE Symposium: Sustainable Infrastructure - Environment Friendly, Safe and Resource Efficient, Bangkok, Thailand, 9-11 September 2009, veröffentlicht in , S. 44-53
DOI: 10.2749/222137809796078586
Preis: € 25,00 inkl. MwSt. als PDF-Dokument  
ZUM EINKAUFSWAGEN HINZUFÜGEN
Vorschau herunterladen (PDF-Datei) 0.03 MB

Bridge Management Systems (BMSs) have been developed since the early 1990s as a decision support system (DSS) for effective Maintenance, Repair and Rehabilitation (MR&R) activities in a large bridg...
Weiterlesen

Bibliografische Angaben

Autor(en):





Medium: Tagungsbeitrag
Sprache(n): Englisch
Tagung: IABSE Symposium: Sustainable Infrastructure - Environment Friendly, Safe and Resource Efficient, Bangkok, Thailand, 9-11 September 2009
Veröffentlicht in:
Seite(n): 44-53 Anzahl der Seiten (im PDF): 8
Seite(n): 44-53
Anzahl der Seiten (im PDF): 8
Jahr: 2009
DOI: 10.2749/222137809796078586
Abstrakt:

Bridge Management Systems (BMSs) have been developed since the early 1990s as a decision support system (DSS) for effective Maintenance, Repair and Rehabilitation (MR&R) activities in a large bridge network. Historical condition ratings obtained from biennial bridge inspections are major resources for predicting future bridge deteriorations via BMSs. However, available historical condition ratings are very limited in all bridge agencies. This constitutes the major barrier for predicting reliably future structural performances. To alleviate this problem, the Backward Prediction Model (BPM) technique for generating the missing historical condition ratings has been developed, and its reliability has been verified using existing condition ratings available from the Maryland Department of Transportation, USA. The function of the BPM is to establish the correlations between the known condition ratings and non-bridge factors including climate, traffic volumes and population growth. Such correlations can then be used to obtain the bridge condition ratings of the missing years. Based on these generated datasets, the currently available bridge deterioration model can be used to predict future bridge conditions. The existing 4 National Bridge Inventory and 9 BPM-generated historical condition ratings are used as input data to compare the prediction accuracy using deterministic bridge deterioration models. The comparison results show that prediction error decreases as more historical data become available. This suggests that the BPM can be used to generate additional historical condition ratings, which is essential for bridge deterioration models to achieve more accurate prediction results. However, there are still significant limitations identified in the current bridge deterioration models. Hence, further research is necessary to improve the prediction accuracy of bridge deterioration models.

Stichwörter:
Wartung