0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

Fundamental study on half-width slab deck replacement method for an existing composite steel girder bridge

 Fundamental study on half-width slab deck replacement method for an existing composite steel girder bridge
Autor(en): , , , ,
Beitrag für IABSE Symposium: Engineering the Future, Vancouver, Canada, 21-23 September 2017, veröffentlicht in , S. 1114-1121
DOI: 10.2749/vancouver.2017.1114
Preis: € 25,00 inkl. MwSt. als PDF-Dokument  
ZUM EINKAUFSWAGEN HINZUFÜGEN
Vorschau herunterladen (PDF-Datei) 0.55 MB

Currently in Japan, RC deck of steel girder bridges suffers significant damage due to the heavy traffic

/ increasing the traffic load and leakage. Therefore, it becomes a time to renewal the ...
Weiterlesen

Bibliografische Angaben

Autor(en): (Department of Civil Engineering, Osaka City University, Osaka, Japan)
(Department of Civil Engineering, Osaka City University, Osaka, Japan)
(CTI Engineering Co., Ltd., Osaka, Japan)
(CTI Engineering Co., Ltd., Osaka, Japan)
(CTI Engineering Co., Ltd., Osaka, Japan)
Medium: Tagungsbeitrag
Sprache(n): Englisch
Tagung: IABSE Symposium: Engineering the Future, Vancouver, Canada, 21-23 September 2017
Veröffentlicht in:
Seite(n): 1114-1121 Anzahl der Seiten (im PDF): 8
Seite(n): 1114-1121
Anzahl der Seiten (im PDF): 8
Jahr: 2017
DOI: 10.2749/vancouver.2017.1114
Abstrakt:

Currently in Japan, RC deck of steel girder bridges suffers significant damage due to the heavy traffic

/ increasing the traffic load and leakage. Therefore, it becomes a time to renewal the slab deck especially the aged bridges designed based on recent codes. To avoid the traffic congestions during construction, it is hardly demanded to propose a new design method to shortening the construction period, as well as reducing the cost to retrofitting of the bridge. In this study, we focused on the amount of retrofit needed to replace the RC deck composite steel girder bridge to precast PC deck non-composite steel girder bridge, under half-traffic servicing state. To clarify the subject, frame analysis and FEM analysis were conducted. It is known from the frame analysis that, remove the load distribution crossbeam during construction may reduce the amount of girder’s retrofitting. It is also revealed that, the slab deck should be partially replaced rather than fully replaced by FEM analysis.

Stichwörter:
FEM-Untersuchung