0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

Fundamental Study on Control of Yield Position of RC Piers

 Fundamental Study on Control of Yield Position of RC Piers
Autor(en): , ,
Beitrag für IABSE Congress: Beyond Structural Engineering in a Changing World, San José, Cost Rica, 25-27 Seotember 2024, veröffentlicht in , S. 685-691
DOI: 10.2749/sanjose.2024.0685
Preis: € 25,00 inkl. MwSt. als PDF-Dokument  
ZUM EINKAUFSWAGEN HINZUFÜGEN
Vorschau herunterladen (PDF-Datei) 0.56 MB

Many of the older RC piers in Japan have stepped sections (referred to as cut-off sections) with a reduced amount of longitudinal reinforcement in response to the cross-sectional force. Figure 1 sh...
Weiterlesen

Bibliografische Angaben

Autor(en): (JR East Consultants Company, Tokyo, Japan)
(Kanto Gakuin University, Kanagawa, Japan)
(JRSE, Tokyo, Japan)
Medium: Tagungsbeitrag
Sprache(n): Englisch
Tagung: IABSE Congress: Beyond Structural Engineering in a Changing World, San José, Cost Rica, 25-27 Seotember 2024
Veröffentlicht in:
Seite(n): 685-691 Anzahl der Seiten (im PDF): 7
Seite(n): 685-691
Anzahl der Seiten (im PDF): 7
DOI: 10.2749/sanjose.2024.0685
Abstrakt:

Many of the older RC piers in Japan have stepped sections (referred to as cut-off sections) with a reduced amount of longitudinal reinforcement in response to the cross-sectional force. Figure 1 shows a RC pier with a cut-off section stripped by an earthquake. In this study, the relationship between the seismic yielding coefficient and equivalent natural period for each soil type was investigated based on horizontal cyclic loading tests on specimens simulating piers with cut-off sections. Dynamic response analyses were conducted for the two yielding types obtained from the cyclic loading tests, and the non-linear response spectrum were generated. The results showed that, for a given natural period, piers yielding at a cut-off section may change to piers not yielding at a cut-off section, depending on the ground conditions. This suggests that for a given natural period, it is possible to control damage at the pier bases through ground improvement.