0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

Framework for the Management of a Large Stock of Earth Retaining Structures

 Framework for the Management of a Large Stock of Earth Retaining Structures
Autor(en): , ,
Beitrag für IABSE Symposium: Towards a Resilient Built Environment Risk and Asset Management, Guimarães, Portugal, 27-29 March 2019, veröffentlicht in , S. 780-787
DOI: 10.2749/guimaraes.2019.0780
Preis: € 25,00 inkl. MwSt. als PDF-Dokument  
ZUM EINKAUFSWAGEN HINZUFÜGEN
Vorschau herunterladen (PDF-Datei) 0.79 MB

With a view to the development of a life-cycle approach to earth retaining walls, as well as an optimal management of the road assets as a whole, this paper presents a novel framework for the asses...
Weiterlesen

Bibliografische Angaben

Autor(en): (Infraestruturas de Portugal, Lisboa, Portugal)
(Infraestruturas de Portugal, Lisboa, Portugal)
(CERIS, ICIST and Faculdade de Ciências e Tecnologia da Universidade NOVA de Lisboa, Caparica, Portugal)
Medium: Tagungsbeitrag
Sprache(n): Englisch
Tagung: IABSE Symposium: Towards a Resilient Built Environment Risk and Asset Management, Guimarães, Portugal, 27-29 March 2019
Veröffentlicht in:
Seite(n): 780-787 Anzahl der Seiten (im PDF): 8
Seite(n): 780-787
Anzahl der Seiten (im PDF): 8
DOI: 10.2749/guimaraes.2019.0780
Abstrakt:

With a view to the development of a life-cycle approach to earth retaining walls, as well as an optimal management of the road assets as a whole, this paper presents a novel framework for the assessment of a large stock of earth retaining structures in a context of limited financial and human resources. In order to adequate the system for the number of structures to be managed a large inventory campaign was previously conducted. These results and how they helped to shape the framework are briefly discussed. Being a proposal for a systematic management of infrastructure assets it was developed according to Business Process Management discipline, namely the Business Process Model and Notation, as specified in the standard ISO/IEC 9510:2013. The developed framework is considered as a management process, with specific intervenient, interrelated activities, specific inputs, and standard outputs.

Stichwörter:
Bewertung Bauwerksprüfung