0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

Fire Risk Management for Highway Bridges in Korea

 Fire Risk Management for Highway Bridges in Korea
Autor(en): , ,
Beitrag für IABSE Conference: Structural Engineering: Providing Solutions to Global Challenges, Geneva, Switzerland, September 2015, veröffentlicht in , S. 890-896
DOI: 10.2749/222137815818358079
Preis: € 25,00 inkl. MwSt. als PDF-Dokument  
ZUM EINKAUFSWAGEN HINZUFÜGEN
Vorschau herunterladen (PDF-Datei) 0.08 MB

A number of bridges on Korean highways have been damaged by fires in recent years. Most of these fires were caused by tanker trucks. In 2010, a gasoline tanker truck parked under a steel box girder...
Weiterlesen

Bibliografische Angaben

Autor(en): (Korea Expressway Corporation, Whasung, Kyunggi, Korea)
(Korea Expressway Corporation, Whasung, Kyunggi, Korea)
(Kangwon National University, Kangwon, Korea)
Medium: Tagungsbeitrag
Sprache(n): Englisch
Tagung: IABSE Conference: Structural Engineering: Providing Solutions to Global Challenges, Geneva, Switzerland, September 2015
Veröffentlicht in:
Seite(n): 890-896 Anzahl der Seiten (im PDF): 7
Seite(n): 890-896
Anzahl der Seiten (im PDF): 7
Jahr: 2015
DOI: 10.2749/222137815818358079
Abstrakt:

A number of bridges on Korean highways have been damaged by fires in recent years. Most of these fires were caused by tanker trucks. In 2010, a gasoline tanker truck parked under a steel box girder bridge caught fire and caused partial collapse of the bridge. To protect bridges against fires, a bridge fire risk assessment procedure and fire-resistant design guidelines were developed in this study. The fire risk assessment procedure is composed of three main steps: Preliminary Risk Analysis (PRA), Simplified Risk Analysis (SRA), and Detailed Risk Analysis (DRA). The fire occurrence probability, vulnerability, and importance of bridges are considered in the risk assessment procedure. For high-risk bridges, fire-resistant designs must be implemented. Two important design considerations are bridge clearance height and under-bridge conditions.

Stichwörter:
Brücke Risiko Bewertung Brand