0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

Fatigue assessment and damage detection of wind turbine structures by continuous health monitoring

 Fatigue assessment and damage detection of wind turbine structures by continuous health monitoring
Autor(en): , ,
Beitrag für IABSE Symposium: Engineering the Future, Vancouver, Canada, 21-23 September 2017, veröffentlicht in , S. 817-824
DOI: 10.2749/vancouver.2017.0817
Preis: € 25,00 inkl. MwSt. als PDF-Dokument  
ZUM EINKAUFSWAGEN HINZUFÜGEN
Vorschau herunterladen (PDF-Datei) 0.2 MB

In order to maximize power production, wind turbines (WTs) are continuously emerging as bigger and taller structures, built in more challenging environments. This development however decreases the ...
Weiterlesen

Bibliografische Angaben

Autor(en): (Ruhr-Universität Bochum )
(Ruhr-Universität Bochum; Airwerk GmbH, Essen )
(Ruhr-Universität Bochum; Ss. Cyril & Methodius University Skopje)
Medium: Tagungsbeitrag
Sprache(n): Englisch
Tagung: IABSE Symposium: Engineering the Future, Vancouver, Canada, 21-23 September 2017
Veröffentlicht in:
Seite(n): 817-824 Anzahl der Seiten (im PDF): 8
Seite(n): 817-824
Anzahl der Seiten (im PDF): 8
Jahr: 2017
DOI: 10.2749/vancouver.2017.0817
Abstrakt:

In order to maximize power production, wind turbines (WTs) are continuously emerging as bigger and taller structures, built in more challenging environments. This development however decreases the reliability of wind turbine (WT) infrastructures. In addition, the dynamic nature of the loads typical for WT structures result in an excessive number of stress cycles during their operation lifetime. This might significantly differ from the fatigue loading design assumptions, which is a determinant factor for limiting the design lifetime of WTs to a minimum target period of 20 years.

Installed Structural Health Monitoring (SHM) system on an operating WT structure provides invaluable insight to the structural performance and can contribute to early damage detection, thus eventually leading to reduced maintenance costs and extension of operation life time. In this paper, a four- year continuously recorded SHM data of an Enercon E40 - 500 kW type WT is utilized for assessing its consumed fatigue life time at a welded connection. The monitoring system was implemented on the WT located in Dortmund, Germany, as part of a DFG-funded research project with cooperation to Ruhr-University Bochum.

Stichwörter:
Windkraftanlage Ermüdungsberechnung