Extension of Line 1 of Lille City Metro

 Extension of Line 1 of Lille City Metro
Autor(en): , , , ,
Beitrag für IABSE Symposium: Tomorrow’s Megastructures, Nantes, France, 19-21 September 2018, veröffentlicht in , S. S16-1
DOI: 10.2749/nantes.2018.s16-1
Preis: € 25,00 inkl. MwSt. als PDF-Dokument  
ZUM EINKAUFSWAGEN HINZUFÜGEN
Vorschau herunterladen (PDF-Datei) 0.31 MB

The Lille city metro, in north of France, was opened in 1983. It was the first automatic metro line in the world, with the VAL technology (Light Automatic Vehicle).

Thirty years later, it was...
Weiterlesen

Bibliografische Angaben

Autor(en): (Systra Consulting and Engineering, France)
(Systra Consulting and Engineering, France)
(Systra Consulting and Engineering, France)
(Systra Consulting and Engineering, France)
(Systra Consulting and Engineering, France)
(Systra Consulting and Engineering, France)
Medium: Tagungsbeitrag
Sprache(n): Englisch
Tagung: IABSE Symposium: Tomorrow’s Megastructures, Nantes, France, 19-21 September 2018
Veröffentlicht in:
Seite(n): S16-1 Anzahl der Seiten (im PDF): 8
Seite(n): S16-1
Anzahl der Seiten (im PDF): 8
DOI: 10.2749/nantes.2018.s16-1
Abstrakt:

The Lille city metro, in north of France, was opened in 1983. It was the first automatic metro line in the world, with the VAL technology (Light Automatic Vehicle).

Thirty years later, it was decided to renovate the line but mainly to double its capacity, increasing train cars length from 26m to 52m. It is an important technical challenge, because modernization, renovation and civil works on the 13.5km of the line shall be done without any impact on metro traffic and station operation.

Three major difficulties had lot of influence on design and civil works. First, the design should be compatible with structural capacity of existing stations and reduced documentation available about them. Then, design, organization and construction schedule should be compatible with urban environment, and overall with the major criteria of no interruption of metro traffic and station operation during all years of works. At least, management of all interfaces between different packages of the project was complex.