0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

Experimental study of the steel-concrete connection in the hybrid girder continuous rigid frame bridge

 Experimental study of the steel-concrete connection in the hybrid girder continuous rigid frame bridge
Autor(en): , , , ,
Beitrag für IABSE Congress: Resilient technologies for sustainable infrastructure, Christchurch, New Zealand, 3-5 February 2021, veröffentlicht in , S. 79-87
DOI: 10.2749/christchurch.2021.0079
Preis: € 25,00 inkl. MwSt. als PDF-Dokument  
ZUM EINKAUFSWAGEN HINZUFÜGEN
Vorschau herunterladen (PDF-Datei) 0.46 MB

A composite joint connecting the steel girder and the concrete girder with the connectors of perfobond ribs and studs was applied in Anhai Bay Bridge under construction with a span of 135m+300m+135...
Weiterlesen

Bibliografische Angaben

Autor(en): (Department of Bridge Engineering, Tongji University, Shanghai, China)
(Department of Bridge Engineering, Tongji University, Shanghai, China)
(Fujian Provincial Expressway Group Co., Ltd., Fuzhou, China)
(Fujian Provincial Expressway Group Co., Ltd., Fuzhou, China)
(CCCC First Highway Xiamen Engineering Co., Ltd., Xiamen, China)
Medium: Tagungsbeitrag
Sprache(n): Englisch
Tagung: IABSE Congress: Resilient technologies for sustainable infrastructure, Christchurch, New Zealand, 3-5 February 2021
Veröffentlicht in:
Seite(n): 79-87 Anzahl der Seiten (im PDF): 9
Seite(n): 79-87
Anzahl der Seiten (im PDF): 9
DOI: 10.2749/christchurch.2021.0079
Abstrakt:

A composite joint connecting the steel girder and the concrete girder with the connectors of perfobond ribs and studs was applied in Anhai Bay Bridge under construction with a span of 135m+300m+135m, which will become the second-largest span of hybrid continuous rigid frame bridge in the world after completion. In this paper, the whole and partial finite element models developed to analyze the main bridge and the detailed load-bearing capacity of the steel-concrete composite joint are described. To study the failure mechanism and evaluate the bearing capacity of the steel-concrete connection, the typical concrete-filled steel cells with a reduced scale of 1:2 were chosen to be the test model. The experiment verifies that the steel-concrete connection has enough bearing capacity, which can resist the compression and shear design forces. The back bearing plate plays an important role in uniformly distributing force.

Stichwörter:
hybrides Tragwerk