0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

Expansion Joint Replacement with Minimal Impacts on the Bridge Structure and on Traffic

 Expansion Joint Replacement with Minimal Impacts on the Bridge Structure and on Traffic
Autor(en): ,
Beitrag für IABSE Conference: Engineering the Past, to Meet the Needs of the Future, Copenhagen, Denmark, 25-27 June 2018, veröffentlicht in , S. 186-193
DOI: 10.2749/copenhagen.2018.186
Preis: € 25,00 inkl. MwSt. als PDF-Dokument  
ZUM EINKAUFSWAGEN HINZUFÜGEN
Vorschau herunterladen (PDF-Datei) 0.15 MB
Bridge expansion joints are key structural components that are subjected to very demanding dynamic loading. Even though modern expansion joints are being continuously developed and improved, they ar...
Weiterlesen

Bibliografische Angaben

Autor(en): (Mageba SA, Bulach, Switzerland)
(Contact: nmeng@mageba.ch)
Medium: Tagungsbeitrag
Sprache(n): Englisch
Tagung: IABSE Conference: Engineering the Past, to Meet the Needs of the Future, Copenhagen, Denmark, 25-27 June 2018
Veröffentlicht in:
Seite(n): 186-193 Anzahl der Seiten (im PDF): 8
Seite(n): 186-193
Anzahl der Seiten (im PDF): 8
DOI: 10.2749/copenhagen.2018.186
Abstrakt: Bridge expansion joints are key structural components that are subjected to very demanding dynamic loading. Even though modern expansion joints are being continuously developed and improved, they are generally still much less robust and less durable than the main structure. Therefore, replacement of expansion joints is commonly required in the maintenance of our transportation infrastructure. In carrying out such replacement work, the impacts on traffic and on the bridge’s superstructure should be minimised, for economic and sustainability reasons. This paper presents various expansion joint replacement methods which minimise such impacts, for a wide range of scenarios and movement requirements. The methods described cover single gap joints, sliding finger joints and modular joints – which, where appropriate, retain and use elements of suitably designed existing joints, thus optimising the replacement process in various respects.
Stichwörter:
Erneuerung Fahrbahnübergangskonstruktion (FÜK)